Preventative Maintenance and Rotating Equipment Overhaul?

11/28/2011 5:00 AM

Hi everybody,

I have some questions if you can help me with i:

What are the preparations for a gas turbine major overhaul, brief the main activities and schedule it step wise?

How do you prepare and on what basis for a plant shutdown?

Why do we review the PM schedules and on what basis to establish the maintenance programs?

What is the technique used for failure analysis of a plant equipment?

What are the main checks and activities for the overhaul of a centrifugal compressor?

Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Guru
United Kingdom - Member - Indeterminate Engineering Fields - Control Engineering - New Member

Join Date: Jan 2007
Location: In the bothy, 7 chains down the line from Dodman's Lane level crossing, in the nation formerly known as Great Britain. Kettle's on.
Posts: 32175
Good Answers: 839
#1

Re: preventive maintenance and rotating equipment overhaul?

11/28/2011 6:01 AM

There are the sorts of things that the Client organisation will have written procedures for. Start digging locally!

__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
Register to Reply
Guru
United Kingdom - Member - Hearts of Oak Popular Science - Paleontology - New Member Engineering Fields - Mechanical Engineering - New Member

Join Date: May 2005
Location: In the Garden
Posts: 3389
Good Answers: 75
#2

Re: preventive maintenance and rotating equipment overhaul?

11/28/2011 6:24 AM

PWS got there first with the real world answer...talk to your service provider and ask what they expect to be in place when their field engineer arrives and what support s/he expects whilst they're there.

I would add:

Check your course notes. This sounds like an assignment / homework question.

__________________
Chaos always wins because it's better organised.
Register to Reply
Active Contributor

Join Date: Aug 2009
Posts: 19
#3

Re: preventive maintenance and rotating equipment overhaul?

11/28/2011 6:35 AM

this is not a homework

one of my colleagues asked me these quastions and found them hard to me to answer so i asked here in the forum

thanks anyway for your feedback :) and your time to read my quastions and writing the replies

:)

Register to Reply
Guru
United Kingdom - Member - Hearts of Oak Popular Science - Paleontology - New Member Engineering Fields - Mechanical Engineering - New Member

Join Date: May 2005
Location: In the Garden
Posts: 3389
Good Answers: 75
#5
In reply to #3

Re: preventive maintenance and rotating equipment overhaul?

11/28/2011 7:56 AM

Okay - my apologies. We get lots of homework questions....

Good luck with the overhaul.

__________________
Chaos always wins because it's better organised.
Register to Reply
Guru

Join Date: Oct 2008
Posts: 42355
Good Answers: 1693
#4

Re: preventive maintenance and rotating equipment overhaul?

11/28/2011 7:02 AM

This forum is not the place to come for such detailed information on equipment about which we know nothing. All we know is that you have a gas turbine generator, and yet, you ask, "What are the preparations for a gas turbine major overhaul, brief the main activities and schedule it step wise.

Each of these questions will require a book sized volume of information to answer completely. And years of experience, as well.

Consult the manufacturer of the equipment and the service company.

Register to Reply
Guru

Join Date: Mar 2007
Location: by the beach in Florida
Posts: 33392
Good Answers: 1817
#6

Re: Preventative Maintenance and Rotating Equipment Overhaul?

11/28/2011 10:07 PM

The first part of this file shows an overhaul of a turbine that had to be repaired because of a crack in the turbine blade...it will give you some idea..

http://www.beld.com/sitedocuments/beldannualreport2006.pdf

__________________
All living things seek to control their own destiny....this is the purpose of life
Register to Reply
Commentator

Join Date: Jun 2009
Location: Between India & Australia
Posts: 71
Good Answers: 3
#7

Re: Preventative Maintenance and Rotating Equipment Overhaul?

11/28/2011 11:13 PM

Contact the OEM or nominated contractor regarding the scope, cost and schedule of the outage.

List down the activities required to be done and resources required.

Typically as an Owner you might have to arrange for the labour, scaffolding and Crane.

Negotiate with cran supplier for the duration you require the nominated crane capacity on hire.

Ensure adeqauet living facilities for labour during outage. The OEM will send their Technical Representataive.

Establish the mandatory spare parts required. Note some spare parts have in excess of 18 months lead time. Establish mandatory repairs.

Inform the market operator of time and duartion of the plant outgae, ensuring it is clear of peak months.

The techniques used for failure analysis depend on the the OEM, keep it in their scope.

The compressor will need CO2 cleaning (Owner scope).

Establish any guaranteed performance improvements and measurement procedure.

Include any balance of plant equipment , generator etc that also need overhaul.

__________________
Continuous Learning
Register to Reply Score 1 for Good Answer
Active Contributor
Egypt - Member - New Member Engineering Fields - Power Engineering - Pain and Joy

Join Date: Jan 2010
Posts: 19
Good Answers: 1
#8
In reply to #7

Re: Preventative Maintenance and Rotating Equipment Overhaul?

11/30/2011 5:46 AM

what is OEM standing for

Register to Reply
Guru
United Kingdom - Member - Hearts of Oak Popular Science - Paleontology - New Member Engineering Fields - Mechanical Engineering - New Member

Join Date: May 2005
Location: In the Garden
Posts: 3389
Good Answers: 75
#9
In reply to #8

Re: Preventative Maintenance and Rotating Equipment Overhaul?

11/30/2011 7:42 AM

Original Equipment Manufacturer.

The name on the label

__________________
Chaos always wins because it's better organised.
Register to Reply
Register to Reply 9 comments

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Copy to Clipboard

Users who posted comments:

English Rose (3); lyn (1); midofnowhere (1); mona sayed (1); PWSlack (1); SolarEagle (1); sv13 (1)

Previous in Forum: Raymond® Vertical Mills Motor Bearing Failure   Next in Forum: DIN Standards

Advertisement