Electricity utilities have
to optimize the amount of spinning reserve against contingencies. Normally the spinning reserve is kept equal to the
biggest generating unit. After the outage of biggest unit,the frequency drops based on system load and connected generating unit
at outage time.
Can anyone advise:
- What is meant by total system / Unit inertia and how to calculate this?
- How to determine the frequency variation, corresponding to active power?