I forgot my password.
Don't have an account?
For 1MW steam plant what should be the specification of the following equipment
1. Boiler and furnace specification and type for 1MW.
2. Turbine (which type is need for 1MW)
3. Condenser specification.
4. Chimney.
Rather - you only Specify:
Heat- exhaust- rate per hour to catch in Boiler(Maybe Water/Steam)--
& time variance if any.
The Waste-Heat Boiler/Steam Generator supplier will offer you the optimum.
You can offer Bonus for delivering the Megawatt at 20-30-40% thermal efficiency.
He will then quote differently.