Contractor Pipeline Cocuments

11/27/2012 12:38 AM

i am planning to start new project of 8 inch dia line pipe of sch XXS of 56 KMs. i need help in making contractor documents e.g

1- pipeline quality management system

2- material handling

3- material traceability

4- correction action report

etc.

thankx in advance

Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Guru

Join Date: Oct 2007
Location: India
Posts: 1246
Good Answers: 34
#1

Re: contractor pipeline documents

11/27/2012 1:50 AM

The best solution for a new project is to hire a good consultant for the job. You will be able to achieve your goal successfully.

Register to Reply
Active Contributor

Join Date: Oct 2012
Posts: 24
#2

Re: contractor pipeline documents

11/27/2012 7:37 AM

Hire someone for the job. It is the best option for you now.

Register to Reply
Guru
Engineering Fields - Piping Design Engineering - Retired Piper

Join Date: Feb 2007
Location: Bayonet Point, Florida
Posts: 635
Good Answers: 61
#3

Re: Contractor Pipeline Comments

11/27/2012 12:43 PM

Kashan,

You do not say "who" you are in this project (Client, Engineering Company, Installation Contractor or other). That would help to know.

The following is a question from another person: What are the things that should be considered for erecting a pipeline?

My answer:

Here are a few things to consider (not necessarily in order)

Feasibility Study

Routing Studies

Property Searches

Right-a-way Planning

Local, State, Province and Country Code Applications

Right-a-Way Approval

Right-a-Way Permits

Right-a-Way acquisition

Geographic Profile Study

Hydraulic Analysis

Primary (Start Point) Pump Station Layout

Start Point Pig Launcher

Start Point Meter Station and Meter Prover

Intermediate Pump Station(s) analysis (possible additional Pumps Pig Receivers and Pig Launchers)

Preliminary Material Estimate, Pipe, Pumps, Drivers, Valves, etc

Preliminary Estimate of Construction Costs

Cathodic Protection requirements Study

Soil Corrosion Analysis

Road and Highway Crossing Study

Water Way (River & Stream) Crossing Studies

Road and Highway Crossing Permits

Water Way Crossing Permits

End Point Meter Station and Meter Prover

End Point Pig Receiver Station

Pipeline Security facilities

Pipeline Operation Philosophy Study

Pipeline Instrumentation plan (SCADA)

Pigs (Purchase or Contract a Service as required)

The ten other items I have forgotten that will jump up and bite you in the pocket book for another 10% of Cost.

This list may give you some ideas for your project

__________________
Do it once and do it right
Register to Reply Score 1 for Good Answer
Register to Reply 3 comments

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Copy to Clipboard

Users who posted comments:

ben11c (1); Joshi (1); PennPiper (1)