Pre-Commissioning and Commissioning Activities in WTG

12/09/2013 12:43 AM

Hi all,

Can any body explain me plz, what are the pre-commissioning and commissioning activities in WTG (Wind Turbine Generator) and also in Wind park other instruments? I am new in wind technology kindly help me.

Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Guru
United Kingdom - Member - Indeterminate Engineering Fields - Control Engineering - New Member

Join Date: Jan 2007
Location: In the bothy, 7 chains down the line from Dodman's Lane level crossing, in the nation formerly known as Great Britain. Kettle's on.
Posts: 32175
Good Answers: 839
#1

Re: Pre-Commissioning and Commissioning Activities in WTG

12/09/2013 9:52 AM

Is there some reason why the equipment supplier's Installation Manual is not to hand?

Is there some reason why the equipment supplier's telephone number is not to hand?

__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
Register to Reply
Guru
New Zealand - Member - Kiwi Popular Science - Weaponology - New Member Engineering Fields - Power Engineering - New Member Engineering Fields - Electrical Engineering - New Member

Join Date: Sep 2006
Location: Auckland, New Zealand
Posts: 8777
Good Answers: 376
#2

Re: Pre-Commissioning and Commissioning Activities in WTG

12/09/2013 1:27 PM

All the main parts of the wind farm (turbine, turbine control, turbine switchgear, transformer, substation switchgear, etc) have some sort of separate commissioning procedure (I should know I wrote and performed some of them) and then there are commissioning procedures when connecting up different parts of the plant (such as the turbine strings back to the substation).

The commissioning procedure is generally specific to the equipment installed and to the overall site and wind farm size and complexity (as dictated by the customer, local standards and regulations and the project manager(s) and associated consultants).

Have you considered looking at example wind farms on the internet, talking with consultant groups that deal with wind farms, performing an internet search for some of the basics to your rather broad questions, etc?

__________________
jack of all trades
Register to Reply
Participant

Join Date: Jan 2010
Posts: 4
#5
In reply to #2

Re: Pre-Commissioning and Commissioning Activities in WTG

12/09/2013 11:50 PM

@ Jack of All trades,

Thanks for responding.

I have searched it on the different search engine and also on linkedin but didnt find proper response. At the moment I do not have machine installation manual because I am in planning stage of the project. That's why I want to know about the activities so that I may be able to discuss with contractor and consultant.

Register to Reply
Guru
New Zealand - Member - Kiwi Popular Science - Weaponology - New Member Engineering Fields - Power Engineering - New Member Engineering Fields - Electrical Engineering - New Member

Join Date: Sep 2006
Location: Auckland, New Zealand
Posts: 8777
Good Answers: 376
#7
In reply to #5

Re: Pre-Commissioning and Commissioning Activities in WTG

12/10/2013 1:18 PM

Oh, I didn't realise your were planning on designing or project-managing an actual windfarm.

See my second paragraph above and I would advise hiring a paid consultant to assist you for your specific application.

__________________
jack of all trades
Register to Reply
Guru

Join Date: Oct 2008
Posts: 42355
Good Answers: 1693
#8
In reply to #7

Re: Pre-Commissioning and Commissioning Activities in WTG

12/10/2013 1:45 PM

That scares me and I'm fearless.

How do these people get these jobs?

Register to Reply
Guru
New Zealand - Member - Kiwi Popular Science - Weaponology - New Member Engineering Fields - Power Engineering - New Member Engineering Fields - Electrical Engineering - New Member

Join Date: Sep 2006
Location: Auckland, New Zealand
Posts: 8777
Good Answers: 376
#9
In reply to #8

Re: Pre-Commissioning and Commissioning Activities in WTG

12/10/2013 7:47 PM

I am sure there are many reasons this occurs, some more dangerous and unethical than others.

__________________
jack of all trades
Register to Reply Off Topic (Score 4)
Guru

Join Date: Oct 2008
Posts: 42355
Good Answers: 1693
#3

Re: Pre-Commissioning and Commissioning Activities in WTG

12/09/2013 5:26 PM
Register to Reply
Participant

Join Date: Jan 2010
Posts: 4
#4
In reply to #3

Re: Pre-Commissioning and Commissioning Activities in WTG

12/09/2013 11:46 PM

@lyn

Thanks for comment.

Actually, I have searched it on google and different search engine but didnt find proper answer. If you can send me any link, it will be appreciated.

Register to Reply Score 1 for Good Answer
Guru

Join Date: Oct 2008
Posts: 42355
Good Answers: 1693
#6
In reply to #4

Re: Pre-Commissioning and Commissioning Activities in WTG

12/10/2013 8:59 AM
Register to Reply
Register to Reply 9 comments

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Copy to Clipboard

Users who posted comments:

jack of all trades (3); lyn (3); Muhammad Nasir Khan (2); PWSlack (1)