33 kv Sub Station

08/28/2014 7:09 AM

can any one tell me what testing and measurement should be carried out while testing and commissioning a 33kv SUB STATION having 2 no 33 kv 315 kva transformer

susanto ghosh

Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru
United Kingdom - Member - Indeterminate Engineering Fields - Control Engineering - New Member

Join Date: Jan 2007
Location: In the bothy, 7 chains down the line from Dodman's Lane level crossing, in the nation formerly known as Great Britain. Kettle's on.
Posts: 32175
Good Answers: 839
#1

Re: 33 kv sub station

08/28/2014 7:50 AM

The manufacturers of the transformers can do this and it should all be in a commissioning protocol agreed between the Client and the transformer manufacturers. The document just needs looking for; that's all.

__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
Register to Reply
Guru
United Kingdom - Member - New Member

Join Date: Aug 2010
Location: Resting under the Major Oak
Posts: 4347
Good Answers: 181
#2

Re: 33 kv sub station

08/28/2014 8:55 AM

Why do you need to know?

__________________
The reports of my death are greatly exaggerated.
Register to Reply
Guru

Join Date: Oct 2008
Posts: 42355
Good Answers: 1693
#3

Re: 33 kv sub station

08/28/2014 9:55 AM

Carnac, the Magnificent can.

Register to Reply
Guru

Join Date: Oct 2009
Posts: 2061
Good Answers: 169
#4

Re: 33 kv Sub Station

08/28/2014 9:57 AM

What are the various switchyard equipments that you have in the substation?

Register to Reply
Guru

Join Date: May 2010
Location: Liverpool, NY
Posts: 961
Good Answers: 131
#5

Re: 33 kv Sub Station

08/28/2014 1:10 PM

Follow the ANSI/NETA (InterNational Electrical Testing Association) Acceptance Testing Specification:

Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems, 2013 edition

http://www.netaworld.org/standards

__________________
To get the right answers, first you need to ask the right questions.
Register to Reply
Guru
Safety - ESD - New Member India - Member - New Member Engineering Fields - Energy Engineering - New Member

Join Date: May 2007
Location: Pune , India
Posts: 875
Good Answers: 42
#6

Re: 33 kv Sub Station

08/28/2014 2:09 PM

A substation has so many components like incoming 33 kv panel comprising of cable termination , Circuit breaker, CTs , PTs , Protective relays , Meters and other Electrical control systems. Transformers Dry type or Oil Immersed, and LT panel comprising of all switching controls and protective systems . Each and every item has to be tested as per schedule before commissioning. So it is mandatory for the Commissioning engineer to carry out all the tests necessary for each and every item as per standard testing procedure of the Electricity Supply authority of the country you install the substation . There are specified standards and regulations to be followed. So learn it throughly before taking up the job.

Register to Reply
Guru
New Zealand - Member - Kiwi Popular Science - Weaponology - New Member Engineering Fields - Power Engineering - New Member Engineering Fields - Electrical Engineering - New Member

Join Date: Sep 2006
Location: Auckland, New Zealand
Posts: 8777
Good Answers: 376
#7

Re: 33 kv Sub Station

08/28/2014 3:54 PM

Sorry we don't answer homework questions here on CR4.

I am assuming this is a homework question and you do not in fact work in or with 33kV substation equipment given the questions you are asking.

__________________
jack of all trades
Register to Reply
Register to Reply 7 comments
Copy to Clipboard

Users who posted comments:

electricalexpert65 (1); jack of all trades (1); lyn (1); PeterT (1); PWSlack (1); TonyS (1); V.I.Abraham (1)

Previous in Forum: Tesing of Zinc Oxide Lightening Arrester   Next in Forum: How Do I Verify The Output Power Of Inverter Drive.

Advertisement