Greetings
We have 8nos of 80mva power transformers & we r planning to do installations of all accessories of transformer first then we will go for vaccumming,oil filling,leak test,filtration,normalize then precom testing, so as per manufacturer if we installed 1st transformer before moving for 2nd transformer manufacturer recommendations to fill N2 in maintank at 2psi(positive pressure)
Planning to fill from maintank conservator
Conservator as aircell bag which will b kept open (atmospheric pressure will come out from air cell)then N2 will be filled from air bleeding pipe of conservator and will open main tank buchlozz relay valves and oltc valve will b closed (ie., only will n2 in main tank of transformer)
So please share your views,i was planning to do like i this is it ok or not