Parallel feeders 4X 1c. 500 mcm. 5kv teck cable One being spare, direct burial accept conduits from building – transformer 15' stubbed out.
The first layer of conductors are spaced 6" apart and go in order of phases A, B, C, & C
The second layer is on top with 6" sand separation and goes in order Spare, Spare, A & B
The way it appears that vertical conduits at building end got crossed over.
The best way I could rearrange paralleling the conductors would be in order of
Spare, A,B&C the second layer on top would be in order A,B,C & Spare?
Question if I leave conductors as installed what effects there would be like sheeting currents would they be increased due to conductors arrangement or no effect?
Second question if I rearrange conductors what effects there would be?
Note the single teck conductor has 1/0 shielding – ground wire which is connected to the ground on supply end only and floating on other end.
Any advice would be greatly appreciated? Thanks