The code call is by a qualified engineer to the AHJ (Authority Having Jurisdiction) in the locale where the battery bank is installed. The engineer should have the following facts before you place the call: Voltage, Amp-Hrs, chemistry, type of installation, ventilation, flammability, etc., etc.
__________________
“Tell me and I forget. Teach me and I remember. Involve me and I learn.” Ben Franklin.