Previous in Forum: 440 Electric Motor   Next in Forum: EC 60034-1 7.5 Voltage (Peak and Gradient) Withstand Levels
Close
Close
Close
2 comments
Rating: Comments: Nested
Anonymous Poster #1

Battery Bank

05/23/2018 7:02 PM

Dear ALL,

asalam alaikum, We have installed the battery bank which is sealed type batteries in the IT room, any required separate room, what was the code call?

Regards

Sultan

Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru
Engineering Fields - Power Engineering - New Member

Join Date: May 2007
Location: NYC metropolitan area.
Posts: 3230
Good Answers: 444
#1

Re: battery bank

05/23/2018 8:50 PM

The code call is by a qualified engineer to the AHJ (Authority Having Jurisdiction) in the locale where the battery bank is installed. The engineer should have the following facts before you place the call: Voltage, Amp-Hrs, chemistry, type of installation, ventilation, flammability, etc., etc.

__________________
“Tell me and I forget. Teach me and I remember. Involve me and I learn.” Ben Franklin.
Reply
Anonymous Poster #1
#2
In reply to #1

Re: battery bank

05/24/2018 7:56 AM

Dear Sadiq,

Sealed type battery bank release small amount of gases during the charging, Install ventilation i am ok.

Regards

Reply
Reply to Forum Thread 2 comments

Previous in Forum: 440 Electric Motor   Next in Forum: EC 60034-1 7.5 Voltage (Peak and Gradient) Withstand Levels

Advertisement