we MAHESHWARY ISPAT LIMITED A INTREGATED STEEL PLANT SITUATED IN CUTTACK, ORISSA, INDIA wanted to put 40MW power generation plant in our 2nd phase of expansion plan. we desire to set up FBC boiler for clean technological measures. In india we have abundunt coal availibity but coal quality is very poor ash prcentage is more than 40. We have alsc abunduntquantity of char , coal fines sludge etc wich is very dirty materials to dispose. In india so far my knowledge go only BHEL goverment of india undertaking has this technology having 10mw modules. but due to their heavy work order book they will not be able to give us this technology on "build- operate" basises on time.
But our plant economic viability depends on this power plant.
It will be our great pleasure if any organisation comes forward give this technology with engineneering, know how, system design, implemntation, and operate.
our role will be supply of brought out item (not patented)
This our urgent requirement