Please comment on slab and wall thickness, rebar size and number?
Need minimum requirements.
Cheers
|
Underground cement water tank |
|
Length |
Width |
Hight |
Cubic meter |
|
3.4 |
3 |
2 |
20.4 |
|
Labor |
|
Concrete |
cost |
Total |
|
11.132 |
45 |
500.94 |
|
350 kg /cubic meter resistant |
|
Steel |
|
Steel de. |
Bar/ton |
kg/m |
|
Ø 10 |
135 |
0.617284 |
|
Ø 12 |
94 |
0.886525 |
|
Ø 14 |
69 |
1.207729 |
|
Ø 16 |
53 |
1.572327 |
|
Description |
Ø |
Bar/ton |
Place |
Qty |
Length |
Width |
T. meter |
T. kg |
|
Top slab top |
Ø 14 |
69 |
bed |
7 |
3.4 |
3 |
71.4 |
86 |
|
Ø 12 |
94 |
cover |
6 |
3.4 |
3 |
61.2 |
54 |
|
Top slab bottom |
Ø 14 |
69 |
bed |
7 |
3.4 |
3 |
71.4 |
86 |
|
Ø 12 |
94 |
cover |
6 |
3.4 |
3 |
61.2 |
54 |
|
long wall top |
Ø 12 |
94 |
bed |
5 |
3.4 |
2 |
34 |
30 |
|
Ø 10 |
135 |
cover |
5 |
3.4 |
2 |
34 |
21 |
|
long wall bottom |
Ø 12 |
94 |
bed |
5 |
3.4 |
2 |
34 |
30 |
|
Ø 10 |
135 |
cover |
5 |
3.4 |
2 |
34 |
21 |
|
Short wall top |
Ø 12 |
94 |
bed |
5 |
3 |
2 |
30 |
27 |
|
Ø 10 |
135 |
cover |
5 |
3 |
2 |
30 |
19 |
|
Short wall bottom |
Ø 12 |
94 |
bed |
5 |
3 |
2 |
30 |
27 |
|
Ø 10 |
135 |
cover |
5 |
3 |
2 |
30 |
19 |
|
Bottom slab top |
Ø 14 |
69 |
bed |
7 |
3.4 |
3 |
71.4 |
86 |
|
Ø 12 |
94 |
cover |
6 |
3.4 |
3 |
61.2 |
54 |
|
Bottom slab bottom |
Ø 14 |
69 |
bed |
7 |
3.4 |
3 |
71.4 |
86 |
|
Ø 12 |
94 |
cover |
6 |
3.4 |
3 |
61.2 |
54 |
|
Sum |
754 |
|
Sum +5% Wast |
792 |
|
cost per kg |
1.47 |
|
Total |
1,161 |
|
Concrete |
Qty |
Length |
width |
Hight |
Sum |
|
Top slab |
1 |
3.4 |
3 |
0.2 |
2.04 |
|
Bottom slab |
1 |
3.4 |
3 |
0.2 |
2.04 |
|
long wall |
2 |
3.4 |
2 |
0.2 |
2.72 |
|
Short wall |
2 |
3 |
2 |
0.2 |
2.4 |
|
Clean concrete |
1 |
4.6 |
4.2 |
0.1 |
1.932 |
|
sum |
11.132 |
|
Sum + 15% wast |
12.8018 |
|
cost |
60 |
|
Total |
768.108 |
|
Summary |
|
Description |
Cost |
Per |
|
Labor |
501 |
0.206118 |
|
Steel |
1,161 |
0.477834 |
|
Concrete |
768 |
0.316048 |
|
Total US$ |
2,430 |