EHV Cables: On-Site Testing

08/17/2008 8:53 AM

Dear All.

Can you please suggest as to what are the High Voltage tests to be conducted on EHV class XLPE cables (say 220kV) after their installation (laying) at site.

What are the equipment required for conducting these tests.

rgds

Deepak

Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru
United Kingdom - Member - Indeterminate Engineering Fields - Control Engineering - New Member

Join Date: Jan 2007
Location: In the bothy, 7 chains down the line from Dodman's Lane level crossing, in the nation formerly known as Great Britain. Kettle's on.
Posts: 32175
Good Answers: 839
#1

Re: EHV Cables: On-Site Testing

08/18/2008 3:56 AM

The tests will be specified in the end Client's requirements and specifications.

The equipment and the test procedure will need to have been completed by the installation subcontractor, and witnessed, before the invoice is paid.

__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
Register to Reply
Active Contributor

Join Date: Aug 2008
Posts: 19
#2

Re: EHV Cables: On-Site Testing

08/25/2008 3:27 AM

In the past there was only a DC high pot test but now a days there is an option of AC, VLF test. This depends on the client that what type of test they prefer. The test equipments named a DC Highpot tester and VLF Tester.