WHAT WILL HAPPEN ( WILL YOU STILL HAVE THE CORRECT METERING ) IF THERE IS A 40A KWH METER INSTALL AND 60A MAIN CIRCUIT BREAKER , IF YOU USES SAY 50 A? CAN YOU TRUST THAT THE METER STILL READ THE CORRECT READINGS

Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Power-User

Join Date: Jan 2008
Location: Silvis, IL (Quad Cities)
Posts: 141
Good Answers: 5
#1

Re: METERING

08/29/2008 11:11 PM

I'm not sure, it appears that you can not read small type, so you probably can't read any meter readings.

P.S. Try not shouting, you'll actually get real answers. (Shouting is when you talk in ALL CAPS, it is very annoying and painful on the eyes.

__________________
Perfection is achieved, not when there is nothing left to add, but when there is nothing else to take away
Reply
Active Contributor

Join Date: May 2008
Location: Bangalore,India
Posts: 10
#2

Re: METERING

08/29/2008 11:21 PM

Existing KWH meter has CT with primary current rating 40A. If CT primary rating changed to 60A, KWH meter definitely can not give correct reading. Please change CT in your equipment or premises suitable to 60A. If KWH meter is with built-in CT, KWH meter has to be changed.

Reply Score 1 for Good Answer
Anonymous Poster
#4
In reply to #2

Re: METERING

09/02/2008 12:32 AM

Hello,

The CT secondary current alone is relevant for Metering. This has been stndardized as either 1 A secondary for EHT application, 5 A secondary for LT application. The Primary Current of 60 A, 600 A , X A is depending on the current carrying capacity of the busbar, equipemnt that has been designed & chosen.

Regards,

N.Suresh

Reply
Guru
United Kingdom - Member - Indeterminate Engineering Fields - Control Engineering - New Member

Join Date: Jan 2007
Location: In the bothy, 7 chains down the line from Dodman's Lane level crossing, in the nation formerly known as Great Britain. Kettle's on.
Posts: 32175
Good Answers: 839
#3

Re: METERING

09/01/2008 10:35 AM
  1. Please turn off Caps Lock. Many readers consider it to be akin to SHOUTING, and very rude.
  2. Arrange to have the kWh meter replaced with one of higher capacity.
__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
Reply
Reply to Forum Thread 4 comments

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Copy to Clipboard

Users who posted comments:

Anonymous Poster (1); bhushan (1); PWSlack (1); Shawn_V_Elect (1)

Previous in Forum: Run time for a solar christmas lights   Next in Forum: Busbar

Advertisement