Specification for Preparing Piping Material

01/02/2009 7:59 AM

can any body hely me how to preparw pms

Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Anonymous Poster
#1

Re: Specification for Preparing Piping Material

01/02/2009 9:06 AM

What does "pms" stand for here?

Register to Reply
Guru
United Kingdom - Member - Indeterminate Engineering Fields - Control Engineering - New Member

Join Date: Jan 2007
Location: In the bothy, 7 chains down the line from Dodman's Lane level crossing, in the nation formerly known as Great Britain. Kettle's on.
Posts: 32175
Good Answers: 839
#5
In reply to #1

Re: Specification for Preparing Piping Material

01/06/2009 10:59 AM

"I could tell you, but then I'd have to kill you."

__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
Register to Reply
Guru

Join Date: Mar 2007
Posts: 2550
Good Answers: 103
#2

Re: Specification for Preparing Piping Material

01/02/2009 11:39 AM

Piping Material Specification Did you refer to ASME B31.3 ?

__________________
Fantastic ideas for a Fantastic World, I make the illogical logical.They put me in cars,they put me in yer tv.They put me in stereos and those little radios you stick in your ears.They even put me in watches, they have teeny gremlins for your watches
Register to Reply
Guru
Engineering Fields - Piping Design Engineering - Retired Piper

Join Date: Feb 2007
Location: Bayonet Point, Florida
Posts: 635
Good Answers: 61
#3

Re: Specification for Preparing Piping Material

01/02/2009 1:50 PM

The following is my answer to similer question on another "Piping" forum
The question:
How to make pipe spec. & what is basic need/data for that
?

My answer:
First, let's see if we can clarify which "pipe spec" you are talking about. You must realize that the term "pipe spec" can be both general and specific at the same time.

Here is most U. S. Companies there might be as many as thirty Specifications that cover piping related issues. There may be a "pipe spec" for:

  • Piping Specification for Plant Layout and Design
  • Piping Specification for Shop Fabrication
  • Piping Specification for Field Fabrication and Installation
  • Piping Specification for Hydrotesting of systems
  • Piping Specification for Hot Insulation
  • Piping Specification for Cold Insulation
  • Piping Specification for Pre-Engineered Pipe Supports
  • Piping Specification for Engineered Spring Supports
  • Piping Specification for Line Class Material
  • Piping Specification for Valve Purchasing

And the list goes on and on.

This is a partial list of some of the specific "pipe specs" that are found on most projects. Included in this list is one that I think you are asking about.

I think you are asking about "Piping Specification for Line Class Material" or it may be called "Piping Line Class Material Specification" or it may have some other combination of words that mean the same thing. But it is a very specific "pipe spec" out of a very big family of piping specifications.

Now to your question as it relates to "this" pipe spec.

How to make pipe spec?

"Piping Material Line Class Specification"

This document would have a cover sheet and a written section which would include the following:
- Document Title
- Document Control Number

- Table of Contents
- Statement of Purpose and or Function
- General Notes
- A listing of all the Codes that apply to the material included here-in
- A list of all the Line Classes with basic data such as Commodity, Material, Flange Rating, etc.
- Each of the individual Line Class sheets (Based on Pressure/Temperature/Commodity)
- The common vent, drain, and other misc. connection details
- Branch Connection Tables (one or more as required)
- Name of Originator (Responsible person), Date created
- Name and date of checker
- Table of Approval for Issue, (Piping Department, Project, Client)
- Table of Issue History listing Revision, date, what was revised, by who, approval sign-off

All of this would then be issued as a single document.

The second part of your question

What is basic need/data for that?

Data Requirements

There are two sides to this question. There is the up front data requirements needed to produce the Line Class Specification. Then there is the output data or, what does each line class need to include?

So, first what is required to start? You need, as a minimum the following information:

· A list of every commodity that will be a part of the project. This means the feed, all products, all waste streams, all utilities and all additives.

· For each commodity you need the complete chemistry including Toxic classifications and reactions to changes in temperature. Here in the U.S.A. we have a document called a "MSDS" (Material Safety Data Sheet). These have all the chemical, toxic, medical recovery and other data about a chemical be it a gas, a liquid, a powder or a solid. If these are available in your country then get a copy for your records of the MSDS for each commodity.

· For each commodity you need the maximum sustained operating pressure and temperature.

· For each you need to know of any short term or upset condition that may cause an increase or decrease in pressure or temperature.

· For each commodity you need to determine the corrosion rate for different (common or special) pipe materials.

· For each commodity you need to know the projected maximum and minimum pipe size expected for the project.

· You need to know the location of the jobsite and the full twelve month weather/temperature profile.

When you have collected all this information then you need to spend a great deal of time reading and studying so you can answer every question that will come up. Don't try to memorize it just remember where to find the material on that issue.

This is just a start. Now you need to know what Piping Code will be the basis for the project.

Will the project governing Code be:

  • ASME B31.1
  • ASME B31.3
  • Or some other Code?

Now the next thing you need to know is the Clients preferences and or restrictions. Things like does the client want to use "Lapp-Joint Stub-End" flanges in certain systems. Does the client want or not want certain types of valves (and why)? What about Weld-neck vs. Slip-on flanges?

Next you need to know the "Design Life" of the plant. This means you need to know how long the plant is supposed to last before it is shut down or starts to fall apart. This issue determines the amount of corrosion allowance you will consider when selecting a wall schedule.

There is no doubt more that I have forgotten to include in this first pass. I will try to add more as I remember. I also know that by posting this here on the pipingdesigners web site others will read it and ad their wisdom.

The finished "Line Class" pipe spec.

Each of the individual Line Class sheet might be created as a spread sheet in a Microsoft Excel Work Book. One spread sheet for each Line Class.

Across you might have the following column headers:

· Item

· Nominal Pipe Size (inches) or (Metric)

· Schedule (Wall Thickness)

· End Type

· Description (This is a simple description of a piping component not a full purchase description)

Vertically the first column (Item) will be divided into "Pipe", "Fittings", "Flanges", "Gaskets", "Bolts" and "Valves"

With-in this column the "Fitting" section and the "Valve" section would be divided to cover the various items normally required based on size.

"Fittings" would include:

  • 90 degree ELLs
  • 45 degree ELLs
  • Straight TEEs
  • Reducing TEEs
  • Caps
  • Unions
  • Etc.

"Valves" would include:

  • Gates
  • Globe
  • Check
  • Ball
  • Butterfly
  • Etc.

Other information that needs to be included on a line class by line class basis includes.

  • Basic Construction (2" and smaller Screwed/ 3" and Larger Flanged and Butt welded, etc)
  • Flange Rating (150# RF)
  • Temperature Limits (Minus 50 degrees F to Plus 500 degrees


I know this is a lot to information to take in.

But do it the same way you would eat an elephant, one bite at a time.

__________________
Do it once and do it right
Register to Reply Score 1 for Good Answer
Guru
United States - Member - USA! Hobbies - Musician - Sound Man Engineering Fields - Mechanical Engineering - More than a Hobby Technical Fields - Technical Writing - New Member

Join Date: Oct 2008
Location: City of Roses.
Posts: 2056
Good Answers: 101
#4
In reply to #3

Re: Specification for Preparing Piping Material

01/02/2009 2:22 PM

Excellent Answer. GA

__________________
Don't believe everything you read on the Internet!
Register to Reply Off Topic (Score 5)
Register to Reply 5 comments

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Copy to Clipboard

Users who posted comments:

Anonymous Poster (1); PennPiper (1); PWSlack (1); RVZ717 (1); sb (1)

Previous in Forum: Laminated Panels with Foam Cores   Next in Forum: Children's Toys

Advertisement