Dear Sir,
We have to install a plate processor using 3 phase input supply (380-415V/50Hz).The machine requires 4kW max. on any one phase with 16 A per phase current consumption. Please let me know the formula to calculate the total power of the machine in kW & a formula to calculate the rating in kVA of the required UPS (power back-up source). Whether a 5kVA or a 15 kVA UPS should be installed?