ASME Section VIII - Div 02 Vessel

07/07/2009 1:54 PM

Hello Friends, We are designing a Div.02 Vessel as per 2007 edition, addenda08, I have some doubts in this process of getting approval from Registered Professional Engineer(RPE). Can we start manufacturing of Vessel before getting approval of Mechanical Design Report from RPE? Is there any restriction by code? As per new code any Engineer with sufficient experience in Pressure Vessel design can approve the UDS and MDR provided that it is acceptable to client, is there any additional requirement on the qualification of the approving authority?

Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Power-User

Join Date: Jan 2009
Location: Western Canada
Posts: 295
Good Answers: 51
#1

Re: ASME Section VIII - Div 02 Vessel

07/07/2009 6:17 PM
  • Please review Annex 2A and 2B.
  • Are you aware of the significance of the User's Design Specification and that it should come from the actual user/client (or third party independent)?
  • The Mechanical Design Report is only finalized at the end of the contract, which includes As Built drawings.
  • Does your company have a U2 stamp/program?
  • You should confirm everything with your local regulator/jurisdiction/Authorized Inspector.
__________________
A little knowledge is a dangerous thing.
Register to Reply
Guru
Engineering Fields - Piping Design Engineering - New Member Egypt - Member - Member since 02/18/2007

Join Date: Feb 2007
Location: Cairo, Egypt
Posts: 1733
Good Answers: 248
#2

Re: ASME Section VIII - Div 02 Vessel

07/08/2009 2:23 AM

Is U2 code stamp required for that vessel as an owner request?

Does your organization hold certificate of authorization U2?

Whatever your answer, for U2 it is a must for PE to review all design drawings and design calculations before starting any fabrication work to avoid any problems arise after work completion where there is no chance to repeat the work.

__________________
It is better to be defeated on principles, than to win on lies!
Register to Reply Score 1 for Good Answer
Active Contributor

Join Date: Dec 2008
Posts: 24
#3

Re: ASME Section VIII - Div 02 Vessel

07/09/2009 8:41 AM

Thanks a lot, Xmech, Abdel. Our client has specified this requirement of Div.02 vessel. We have got the UDS from client, now we have to complete this Vessel within a short period of time. For this purpose we want to start fabrication as soon as possible, can we start fabrication on the basis of apporval given by client's technical consultant? As approval from RPE may take a lot of time. Does code has put any such restriction? As Xmech says should the RPE approval for Mechanical Design report be taken at the end of contract with as built drawings which is supported by clauses Annexure 2B? Secondly the Vessel is not too critical to design and do not have cyclic loading.

Register to Reply
Register to Reply 3 comments

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Copy to Clipboard

Users who posted comments:

Abdel Halim Galala (1); Mechie (1); XMech (1)

Previous in Forum: Safety Valve Body Repair Procedure   Next in Forum: Technical Service - General Questions
You might be interested in: Bar Code Scanners, Bar Code Cards, Bar Code Software

Advertisement