Maximum Demand

07/27/2009 4:02 AM

how we can calculate maximum demand.

Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru
India - Member - New Member Engineering Fields - Electromechanical Engineering - New Member

Join Date: Oct 2006
Location: India, 200 Km. North of Delhi.
Posts: 1393
Good Answers: 53
#1

Re: md

07/27/2009 4:25 AM

Of what?????????????????

Reply
Guru
United Kingdom - Member - Indeterminate Engineering Fields - Control Engineering - New Member

Join Date: Jan 2007
Location: In the bothy, 7 chains down the line from Dodman's Lane level crossing, in the nation formerly known as Great Britain. Kettle's on.
Posts: 32175
Good Answers: 839
#2

Re: md

07/27/2009 4:42 AM

Of an electrical system? Easy. Measure it.

__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
Reply
Participant

Join Date: Jul 2009
Posts: 2
#3

Re: Maximum Demand

07/27/2009 6:47 PM

In any company, when it takes service connections from electricity authority, it agrees at some contract demand. This contract demand should not be exceeded during a billing period. Now this demand is an integrated value of demands within a specified period like 30 min/15 min or so. Not an instanteneous value. For example , if we say some x company has its contract demand of 30MVA, then it means that its demand limit is 30MVA*30Min=900 MVA Min.

Now if the demand is 10 MVA for first 10 min and then 20 MVA for next 20 min, then Maximum Demand calculation=(10MVA*10Min)+(20MVA*20Min)

=100+400=500 MVA min

So, ur MD=500MVA Min/30 Min=16.66MVA

Reply
Member

Join Date: Nov 2008
Posts: 5
#4

Re: Maximum Demand

07/28/2009 5:31 AM

Existing system means take peak demand achieved last one year readings.

Estimation means Total Connected load *demand factor=Max.demand

Reply
Reply to Forum Thread 4 comments
Copy to Clipboard

Users who posted comments:

mbperumal (1); PWSlack (1); rakesh_semwal (1); sohil (1)

Previous in Forum: PI Jumper in High Voltage Transmission Line   Next in Forum: Electrically Operated Traveling Crane (EOT)
You might be interested in: Power Quality Analyzers, Utility Meters, Water Heaters

Advertisement