Your helpful comments would be appreciated here:
I need to run future wiring through a concrete slab floor. The floor above will be a greenhouse on the second floor. We will pour 6" of concrete. I've set four 1" sched, 40 PVC electrical conduit in place to handle the future wiring, anticipated to be about 6000 W, 120 V. The conduit extends about 18" above the concrete floor.
Is this a good plan. I was considering using a 3" PVC drain sleeve, but was worried that it would violate the building code, so I chose 4 x 1" PVC conduit. Is the combustibility of PVC a problem?
Thank-you in advance.