A contractor is building a tank for us, now that the fabrication has finished, i now write a report based on quality assessment carried out on the tank. Here is the report:


QUALITY ASSESSMENT REPORT ON LN FABRICATED FIRE WATER TANK.

PAGE 1 of 3

Inspected entity: LN Engineering And Group

Inspected Activity: (FIRE WATER TANK)

Objective of inspection: To check compliance with contract requirements, design specifications and applicable Codes & Standards and client's specification.

Location: Ovade-Ogarefe Gas Plant Processing Facility

Date: 20 /12/ 09

References: Design spec, API 650; 1550-SPP-002.

S/N

ACTIVITY / OBSERVATION

REMARKS

GENERAL

The quality inspection was carried out as a part of technical/workmanship quality assessment exercise prior to final qualification of the structure for acceptance.

An approved detail design drawings / inspection check-list and reference documents were used to check compliance with main contract defined work scope / client's specification requirements.

1. INSPECTION FINDINGS.

It is well know that engineering disasters are often the results of poor quality of workmanship and violation of construction rules.

2. The followings are the defects found on the fire water tank structure:

  1. Multiple tack welds / weld spatters.
  2. Multiple excessive grindings.
  3. Multiple Notches / Cracks like defects.
  4. Sharp weld edges / grinding Cuts on shell plates.

3. Tank inspection /Requirements.

  1. Pneumatic inspection of the reinforcement plates not done.
  1. Radiographic examination of Nozzles joint on tank NOT Done.

In section 3. 7.8.11 of API, the nozzle neck and transition piece... shall receive 100% RT.

  1. Plumbness check was NOT done and this is highly required to ensure that the internal equilibrium and stress level on the tank is not grossly affected (due deflection under service loading).
  2. Reports on tests- DP, RT MT were NOT submitted-they are required for evaluations and compliance certification.

4. Design issues

No design detail Calculations on tank component ports- such as

(i) Sizing of vent in accordance with AP1 standard 2000.

(ii) Shell opening reinforcement plates thickness i.e. Reinforcement pad/Area compensation calculations.

(iii) No design calculations for wind and seismic conditions- to check for overturning moment effects.

5. Construction practices / rules.

(i) LN used unqualified welders to do welding work on the tank at night.

(ii) And they also used uncertified welders to weld the shell nozzle flanges and piping spools. Due to these non-conformities; I gave LN the options to cut out the identified joints or to perform radiographic test to evaluate the quality of welds but none of the options was implemented till now.

(6) Documentation

(i) No Design calculation and approved drawing sets for the fire water tank.

(ii) No NDT procedures submitted,

(iii) No daily Quality reports submitted

(iv) Painting procedures submitted do not conform to Client's painting specifications.

(7) Contractor character

LN MD destroyed the working drawings for the fire water tank, and since then pooc inspectors have no drawings to inspect their job, and Such un-checked job is not acceptable.

(5) Recommendation:

i. LN should perform basic calculation or deploy conventional FINITE ELEMENT Analysis to predict the stresses which are then compared with the allowable value for a given fatigue life and probability of failure from the standards; by this, the tank could be qualified or deem acceptable, if every weld in it had a stress correspond to just below a 1% failure probability.

ii. LN should carry out dye penetrant test on all the grinded portion of the tank and arc strikes to check if there are cracks.

Note: None of the construction Codes accept crack defects because (from Linear Elastic Stress Calculations), it shows that stresses at crack tip are infinite and the material would fail under any load, no mater how small.

iii Ln should replace one of the fire water tank pumps. The coil of the pump got burnt by LN supervisor but instead of replacing with new pump, they are planning to re-wind the coil. This is not acceptable since the tank had not been commissioned.

NCR

NCR

3CONCLUSION
  • It is my opinion that no further payment should be made to LN till final acceptance report covering Fire Water Tank, Ring Main Piping and Portable Water System is circulated.
  • All LN work variation cost should cross checked with all pooc supervisors on the project to quantify the cost with the actual work involved.
Prepared by: Iyere S. Peter

Project Quality Engineer

Pooc.

The problem now is that the project engineer is saying that the tests i requested the contractor to do are not necessary.

The tank is constructed to API 650 STD. What are the actual tests to be carry out to qualify the tank for final acceptance? I need all your help beyond my understanding in the above report.

thanks to all who had be helping me.

__________________
Peter Iyere
Register to Reply
Pathfinder Tags: moodyjp
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru
Popular Science - Weaponology - New Member United Kingdom - Member - New Member

Join Date: May 2007
Location: Harlow England
Posts: 16512
Good Answers: 670
#1

Re: Fire water tank qualification

12/23/2009 10:24 AM

The problem now is that the project engineer is saying that the tests i requested the contractor to do are not necessary.

You don't say who this engineer is employed by.
If he is employed by the same people as you then suggest he signs it off, or he asks your boss to sign it off.
You (of course) don't sign it off, you've raised your report, it's up to the recipients of the report to take action or over-rule you.
I left the QA field when a report of mine was ignored in order to get a stage payment.
Del

__________________
health warning: These posts may contain traces of nut.
Register to Reply
Power-User
Hobbies - Hunting - Deer and Birds Hobbies - HAM Radio - Achieved Ham Radio license in 2008 Hobbies - Fishing - Fisherman United States - US - Statue of Liberty - Know freedom, no tyranny.  Know tyranny, no freedom. Hobbies - DIY Welding - Beginner

Join Date: Sep 2009
Location: Pacific Northwest USA
Posts: 223
Good Answers: 19
#2

Re: Fire water tank qualification

12/23/2009 12:00 PM

Peter,

Since LEMNA International (as LEMNA Energy Resoruces) is not only in charge of engineering, procurement, and construction - but also installation - Del The Cat is absolutely right. Interesting why he won't just sign off, even if a test or a number of tests weren't called for, if it has problems as you noted then he should acknowledge said problems regardless if it appears to meet form/fit/function of drawings, some of your findings may be significant problems. I would inform your supervisor to discuss this with his supervisor.

Matt

__________________
Go green, use a solar powered light saber...
Register to Reply
Member

Join Date: Nov 2009
Posts: 7
#3

Re: Fabricated Fire Water Tank Qualification

12/24/2009 4:03 AM

Hi

I found that a Jenny asked same question in this forum 1 month ago.

Please use search box at the top of site to find this question.

Rgs

Register to Reply
Guru
Engineering Fields - Piping Design Engineering - New Member Egypt - Member - Member since 02/18/2007

Join Date: Feb 2007
Location: Cairo, Egypt
Posts: 1733
Good Answers: 248
#4

Re: Fabricated Fire Water Tank Qualification

12/24/2009 9:08 PM

In the contract signed by both the owner and contractor, there is a scope of work, to be strictly apply. And if the contractor accepts to do the job under the rules of API 650, hence he have to do the job as described at the code.

No way to proceed any hydrotest, where it MAY be pass and say it is OK, unless the contractor perform all tasks and activities as per code and doing all required repairs. I deeply support the CONCLUSION prepared by the Project Quality Engineer.

From the first, it is the fault of the owner letting the contractor to do the job without a third party or any type of supervision.

__________________
It is better to be defeated on principles, than to win on lies!
Register to Reply
Register to Reply 4 comments
Copy to Clipboard

Users who posted comments: