Previous in Forum: PSI for Cold Rolling   Next in Forum: Paper Manufacturing Equipment
Close
Close
Close
2 comments
Rate Comments: Nested
Participant

Join Date: Mar 2010
Posts: 4

Welding Precautions

03/24/2010 5:32 AM

Hello,

What precautions to take to the welding SA 533 ASME II-A material.

Best Regards

Register to Reply
Pathfinder Tags: Welding
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru
United Kingdom - Member - Indeterminate Engineering Fields - Control Engineering - New Member

Join Date: Jan 2007
Location: In the bothy, 7 chains down the line from Dodman's Lane level crossing, in the nation formerly known as Great Britain. Kettle's on.
Posts: 32175
Good Answers: 839
#1

Re: welding

03/24/2010 5:37 AM

This lot have got it all sussed out.

__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
Register to Reply
Commentator
Engineering Fields - Piping Design Engineering - New Member

Join Date: Apr 2010
Posts: 66
Good Answers: 1
#2

Re: Welding Precautions

04/28/2010 5:04 AM

A-533 falls in P.No.3 category, the following procedure shall be applicable for welding: Preheat: 100-150 deg C if > 25mm Filler wire: ER-80S-D2 Welding Electrode: E-7018A1 Interpass temp.: Not less than preheat temp. PWHT: See Table UCS-56 for your specific case Hope this would help. Regards, Ashfaq Anwer http://forums.thepetrostreet.com

Register to Reply
Register to Reply 2 comments

Previous in Forum: PSI for Cold Rolling   Next in Forum: Paper Manufacturing Equipment

Advertisement