Hello everybody!
I have to prepare sketches with the fire protection thermo sensitive cables
installation on field devices.
Does anybody know/have any guideline for cable installation around different
type of equipment - for example: if I have a column, should the cable be
installed on top, on bottom, should it go from bottom to top or how? On
electrical transformers - on top or around?
Thanks in advance,
Costin