Calculation

10/13/2010 2:03 AM

please guide me in my project:

this project is a petrochemical plant.this part that I need is length 150,wide 85 m.

inclouded some vessels a storage tank with high above 55 m (that ia the highest structure in this part) and pipe-rack in steel structure material.

I need to know how can I calculate the following parameter :

1)earth pit .

2)lightning protection.

Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru
United Kingdom - Member - Indeterminate Engineering Fields - Control Engineering - New Member

Join Date: Jan 2007
Location: In the bothy, 7 chains down the line from Dodman's Lane level crossing, in the nation formerly known as Great Britain. Kettle's on.
Posts: 32175
Good Answers: 839
#1

Re: calculation

10/13/2010 3:24 AM

<...earth pit ...>

British Standard 7671 applies, though if the earthing provision is anything other than TT or IT, an earth pit may be unneccessary.

__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
Register to Reply
Power-User

Join Date: Jun 2010
Posts: 348
Good Answers: 10
#2

Re: calculation

10/13/2010 7:21 AM

And what about:

3) Cathodic Protection of your petro chem plant, is that already there?

__________________
Knowledge sharing is a WIN-WIN situation
Register to Reply
Register to Reply 2 comments

Previous in Forum: Work Placement   Next in Forum: Wrong Metering CT Ratio

Advertisement