Pressure Vessel - Hydrostatic Test

01/18/2011 9:44 AM

hi

i want to know what is the optimum time for hydrostatic test of pressure vessels?

thanks a millions.

Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Guru
United Kingdom - Member - Indeterminate Engineering Fields - Control Engineering - New Member

Join Date: Jan 2007
Location: In the bothy, 7 chains down the line from Dodman's Lane level crossing, in the nation formerly known as Great Britain. Kettle's on.
Posts: 32175
Good Answers: 839
#1

Re: pressure vessel

01/18/2011 9:51 AM

The optimum time is that period stipulated by the Engineer/Surveyor from the company that is supplying burst indemnity insurance for the facility during the Factory Inspection Test.

__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
Reply Score 1 for Good Answer
Anonymous Poster
#2
In reply to #1

Re: pressure vessel

01/18/2011 10:15 AM

thanks for your answer befor this i check in ASME and it dose not specifically address the hold time duration as you answer.

thanks again

Reply
Guru
United Kingdom - Member - New Member

Join Date: Aug 2010
Location: Resting under the Major Oak
Posts: 4347
Good Answers: 181
#3
In reply to #2

Re: pressure vessel

01/18/2011 11:33 AM

Did you ask for hold time duration?

__________________
The reports of my death are greatly exaggerated.
Reply
Participant

Join Date: Jan 2011
Location: Tehran-Iran
Posts: 1
#6
In reply to #3

Re: pressure vessel

01/19/2011 2:11 AM

yes i did TonS

__________________
SAMAND
Reply
Guru
United Kingdom - Member - Indeterminate Engineering Fields - Control Engineering - New Member

Join Date: Jan 2007
Location: In the bothy, 7 chains down the line from Dodman's Lane level crossing, in the nation formerly known as Great Britain. Kettle's on.
Posts: 32175
Good Answers: 839
#4
In reply to #2

Re: pressure vessel

01/18/2011 5:51 PM

Then ask the Engineer/Surveyor for the company that is ............

OK?

__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
Reply
Active Contributor

Join Date: Jan 2011
Posts: 12
#5

Re: Pressure Vessel - Hydrostatic Test

01/18/2011 11:46 PM

Hi,

Usually 1 hour.

pressurize step by step - 25% each step and hold 10 min.

Once reach 100% hold for 1 hour.

Reply
Power-User

Join Date: Dec 2010
Posts: 377
Good Answers: 20
#7

Re: Pressure Vessel - Hydrostatic Test

01/22/2011 12:56 PM

Usually pressurisation is done in steps. waiting 10 or 15 minutes after each step of say 15 or 20%. At working pressure of vessel wait for one hour then over pressurized to specified test pressure and usually it is specified .5 hr or 1 hr. Releasing of pressure shall also be in steps so that vessel take its shape well.

Reply
Reply to Forum Thread 7 comments

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Copy to Clipboard

Users who posted comments:

Anonymous Poster (1); mehdiarab (1); mr.varan (1); Mukesh0861 (1); PWSlack (2); TonyS (1)

Previous in Forum: Diff Press Via Flowrate   Next in Forum: High Pressure

Advertisement