Number of Supply Services Permitted in a Building

04/11/2007 11:13 AM

Please see CEC 6-102,

I want to rent half of my garage, I have the existing service meter in the garage. Now I am planning to split and build a separation on dry-wall and get another service to the other side of the garage to rent out with its own meter. But I was told to get two same voltage services in one building I need a fire wall separation. My question is:

1) The code allows to have the same voltage in one building, if I buy my power from different authorities. (Buying from different authorities increase any public safety?)

2)It allows also to have different voltage in the same building, even if for 120V rated equipment you could have power from either single phase 120/240 or three phase 208/120, or at that matter you could use 240 and 208 supply for 240V single phase rated equipment. (How does this address any safety)

3)The rule specifies self contained occupancies are permitted to have different services in the same building. What is the definition of "Self contained occupancy" means, is it having fire wall or fire separation between the two buildings, if there is a fire wall requirement, what is the rating. Is it half hour or one hour separation. What kind of fire rating I get from regular drywall.

Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru
United Kingdom - Member - Indeterminate Engineering Fields - Control Engineering - New Member

Join Date: Jan 2007
Location: In the bothy, 7 chains down the line from Dodman's Lane level crossing, in the nation formerly known as Great Britain. Kettle's on.
Posts: 32175
Good Answers: 839
#1

Re: Number of Supply Services Permitted in a Building

04/11/2007 11:33 AM

The local planning office may be able to help with this one.

__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
Reply
Anonymous Poster
#2

Re: Number of Supply Services Permitted in a Building

04/11/2007 5:06 PM

I don't know the answer, but it it a very good question. Please Canadian Electrical Code expertise answer these questions.

Reply
Anonymous Poster
#3

Re: Number of Supply Services Permitted in a Building

04/12/2007 11:48 AM

The issue you are bucking is one that is a mixed bag the " public safety " side is the dual source problem in any structure especially if a fire occurs which can be a real issue for fire fighter personnel ( thou shalt not spray live ckt's with water!) any way each of the jurisdictions have there own rules , some very diverse (perverse &/or contradictory) in nature. You should just ck w/your building/electrical Dept. and live with the rules . FYI a fire wall isn't a bad idea between you and a rental unit especially a garage.


Jon

Reply
Guru
United Kingdom - Member - Indeterminate Engineering Fields - Control Engineering - New Member

Join Date: Jan 2007
Location: In the bothy, 7 chains down the line from Dodman's Lane level crossing, in the nation formerly known as Great Britain. Kettle's on.
Posts: 32175
Good Answers: 839
#4
In reply to #3

Re: Number of Supply Services Permitted in a Building

04/12/2007 11:51 AM

...and a fire ceiling.

Question for original poster: why is there a need to divide the space?

__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
Reply
Reply to Forum Thread 4 comments

Previous in Forum: Earthing System: Dirty/Clean Earth   Next in Forum: HP Laptop AC Power Supply

Advertisement