Previous in Forum: Refresh My Knowledge - Wiring Diagram   Next in Forum: Lighting
Close
Close
Close
2 comments
Rate Comments: Nested
Participant

Join Date: May 2011
Posts: 2

Class II Hazardous Area Classification

05/17/2011 10:59 AM

Hi,

I have to do area classification for a industrial process plant. The chemical is sodium cyanide in solid form, it's not combustable nor flammable. My question is should the area be classified as Class II, Division II, Group G since the equipment need to be dust proof to prevent any unwanted insulation barrier between electrical contacts? Thanks.

Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru
United Kingdom - Member - Indeterminate Engineering Fields - Control Engineering - New Member

Join Date: Jan 2007
Location: In the bothy, 7 chains down the line from Dodman's Lane level crossing, in the nation formerly known as Great Britain. Kettle's on.
Posts: 32175
Good Answers: 839
#1

Re: Class II Hazardous Area Classification

05/17/2011 11:02 AM

As the material is not combustable, the only criterion needed to the electrical equipment is a satisfactory Ingress Protection rating. However, if the rating works out too severe, it might indicate that the facility has a materials containment problem opportunity to address, both on Health & Safety and economic grounds.

__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
Register to Reply
Guru
United States - Member - Member Engineering Fields - Electrical Engineering - Electrical Construction

Join Date: Apr 2010
Location: Mid Western USA - The Corn Belt
Posts: 1439
Good Answers: 58
#2

Re: Class II Hazardous Area Classification

05/17/2011 11:24 AM

dman,

If the "dust' is not combustible nor flammable why not go with a NEMA 4X classification rather than the expense of a CII, DII, Group G Area classification?

Go to this link for more info.

__________________
The first 5 days after a weekend are always the hardest................................
Register to Reply
Register to Reply 2 comments

Previous in Forum: Refresh My Knowledge - Wiring Diagram   Next in Forum: Lighting

Advertisement