Manufacturing - Calculate the OEE/Shift

12/13/2011 12:11 AM

Hi friends

Can you pl suggest me.

In machining section say for example in turning center

How to calculate the OEE/shift if the set up change is more than one and cycle time or no of piece/minute is different.

For example..

In shift A.

Part No A cycle time is 75seconds

Part No B cycle time is 70 Seconds

Part No C cycle time is 95second

Part No D cycle time is 100seconds.

Shift length is 8 hours.

Planned break hours:60min

Down time;80min(Including 4 setup change)

Part No A produced:50 pieces

Part No B produeced:75pieces

Part No C produced:56 pieces

Part No D produed:54 pieces.

In Above example can you pl calculate the OEE.

If you give the brief explanation with example which will be helpful for me.

Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Guru
United Kingdom - Member - Indeterminate Engineering Fields - Control Engineering - New Member

Join Date: Jan 2007
Location: In the bothy, 7 chains down the line from Dodman's Lane level crossing, in the nation formerly known as Great Britain. Kettle's on.
Posts: 32175
Good Answers: 839
#1

Re: manufacturing

12/13/2011 3:17 AM

What's the pass mark?

__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
Register to Reply
Participant

Join Date: Dec 2011
Posts: 1
#2

Re: Manufacturing - Calculate the OEE/Shift

12/14/2011 7:04 AM

Hi,

Your OEE for the shift is 68%.

Your Availability for the shift is 71%

Assuming you've no Quality Losses then your Performance is 96%

Total Shift Time is 480mins (8 Hours)

Product Times:

Product Cycle Time Qty Seconds Minutes

Product A 75 x 50 = 3,750 = 62.50 Minutes

Product B 70 x 75 = 87.50 Minutes

Product C 95 x 56 = 88.67 Minutes

Product D 100 x 54 = 90.00 Minutes

Total Minutes is 328.67

328.67/480 = 68% OEE

140 minutes (planned and unplanned) / 480 = 29% downtime = 71% Availability.

OEE is also

AxPxQ = OEE

71% x P x Q = 68%

PQ = 68/71

Hope this helps

Andrew.

Register to Reply Score 1 for Good Answer
Register to Reply 2 comments

"Almost" Good Answers: