Dear sir,
we have 30MW power plant, the generation is 11kv, then we step up it to 110kv for due to grid.normally we synchronizing alternator with grid at 11kv bus.due to our home load condition we want synchronizing grid at 110kv side. switch yard is 500meter away from the synchronizing panel. is any problem come?, any distance limit is requird?guide me,
thank you,
B.JEYACHANDRAN.