Coal Handling System

01/24/2012 4:56 AM

Dear sir,

I am doing coal handling system erection work.

I want to know the standard sequence of coal handling system erection procedure.

Thanks & Regards

chandrasekaran.n

Register to Reply
Pathfinder Tags: Material handling syatem
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru
United Kingdom - Member - Indeterminate Engineering Fields - Control Engineering - New Member

Join Date: Jan 2007
Location: In the bothy, 7 chains down the line from Dodman's Lane level crossing, in the nation formerly known as Great Britain. Kettle's on.
Posts: 32175
Good Answers: 839
#1

Re: Coal handling system

01/24/2012 5:16 AM

Er, wouldn't the employer have a standard procedure for this? If not, then what the &$%£ has the Client purchased?

__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
Register to Reply
Guru
United Kingdom - Member - New Member

Join Date: Aug 2010
Location: Resting under the Major Oak
Posts: 4347
Good Answers: 181
#2

Re: Coal Handling System

01/24/2012 9:18 AM

Start at the bottom and work upwards. Your employer must have work schedule for this work, ask them.

__________________
The reports of my death are greatly exaggerated.
Register to Reply
Guru
United States - Member - Member Engineering Fields - Electrical Engineering - Electrical Construction

Join Date: Apr 2010
Location: Mid Western USA - The Corn Belt
Posts: 1439
Good Answers: 58
#3

Re: Coal Handling System

01/24/2012 11:59 AM

Perhaps the design Engineer has specifications or better yet a scope of work, maybe even some construction drawings.

Once you have obtain the required documents you can lay out a sequence of erection.

Follow this path young grasshopper to the destination of coal handling system erection procedure

__________________
The first 5 days after a weekend are always the hardest................................
Register to Reply
Register to Reply 3 comments
Copy to Clipboard

Users who posted comments:

KJK/USA (1); PWSlack (1); TonyS (1)

Previous in Forum: Thread Rolling Diameters?   Next in Forum: ANSI Leakage Spec and Calculation

Advertisement