Dear All,
in my construction site in UP (East), we have a 33 KV substation that is fed from two 33 KV feeders from two different 132/33 KV substations.
The power supply company wants us to install sommation meter at our 33 KV sustation.
since the sanctioned Load for us is 4 MVA, computing max demand in real time is the problem.
I want to know if there is a system by which this can be done. One meter manufacturing co claims it has a solution, i want to make sure before we make a purchase for this meter.
Looking forward to comments from the Forum.
Regards
K S Soin