Previous in Forum: Welding on C/S Pipe With LTCS Flange   Next in Forum: Misalignment of the 10" Stainless Steel Pipe
Close
Close
Close
Rate Comments: Nested
Active Contributor

Join Date: Mar 2011
Location: Saudi Arabia
Posts: 10

Surface Preparation

02/07/2012 12:59 PM

what is the technical reason of spools belongs to PWHT , After blasting substrate getting blackish mark soonly, required blasting surface cleanliness is SA 2.5

__________________
No Pain No Gain
Register to Reply
Pathfinder Tags: QA
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru

Join Date: Mar 2007
Location: by the beach in Florida
Posts: 33392
Good Answers: 1817
#1

Re: Surface Preparation

02/07/2012 2:51 PM
__________________
All living things seek to control their own destiny....this is the purpose of life
Register to Reply
Register to Reply

Previous in Forum: Welding on C/S Pipe With LTCS Flange   Next in Forum: Misalignment of the 10" Stainless Steel Pipe

Advertisement