Siemens Steam Turbine

06/14/2012 5:54 AM

i work in steam power plant now we will go to update the control system for the Turbine control system because there are alot of problem related to the spare parts for the modules and electronic parts.

the old system is from siemens to control 330MW steam turbine and as happened no spare part are availiable and should be replaced.

now we issue a bid to update the system and some company as ABB, Emerson and of course siemens are competed to win.

the problem is ABB and Emerson had some deviation :

1- required the geometrical and matrials parameters for TSE (turbine stress evaluators)configration.

2-for turbine stress calculation both contractor need some detailed information related to matrial dimension...... ETC.

for siemens every thing is ok because it has all of these data but its price is twice.

Thanks

Ahmed morsy - egypt - cairo west power plant

Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru
United States - Member - Member Engineering Fields - Electrical Engineering - Electrical Construction

Join Date: Apr 2010
Location: Mid Western USA - The Corn Belt
Posts: 1439
Good Answers: 58
#1

Re: Siemens Steam Turbine

06/14/2012 9:44 AM

If you want accurate bids that all represent the actual SOW, you must provide ALL bidders with the SAME information and bid documents.

Of course Siemens is "competed" to win, it is a Siemens turbine. Siemens had better technical information on the turbine.

Of course ABB and Emerson had some deviation. Without adequate technical information, they had to make many assumptions to cover themselves that most likely increased their bid price.

If Siemens is aware the other bidders did not have the needed technical information to bid, you most likely received an inflated Siemens Bid.

By not providing the other bidders with the information Siemens had, you did yourself no favors.

What was the point of your post?

__________________
The first 5 days after a weekend are always the hardest................................
Register to Reply
Guru

Join Date: Jun 2011
Location: Phnom Penh
Posts: 4019
Good Answers: 102
#2

Re: Siemens Steam Turbine

06/16/2012 5:12 AM

So even without all the data Emmerson and ABB still managed to provide a proposal with some dependencies on more information....

Give them the information.

Of course you may be concerned that the non-Siemens bidders may not have it quite right.

Factor of 2 in the pricing......Siemens may not be gouging you they may be realistic.

__________________
Difficulty is not an obstacle it is merely an attribute.
Register to Reply
Guru

Join Date: Dec 2006
Location: Hop around Toronto, New York & Karachi
Posts: 1876
Good Answers: 19
#3

Re: Siemens Steam Turbine

06/17/2012 1:35 AM

You have 3 Options:

1) give ABB & Emerson the inforrmation.

2) give order to Siemens.

3) Your Boiler + Steam Turbines already paid back. Sell and replace complete on EPC. minus the sell-amount and you are in a better position price-wise & system-wise.

__________________
I not only use all the brains that I have, but all that I can borrow. Woodrow Wilson
Register to Reply
Register to Reply 3 comments
Copy to Clipboard

Users who posted comments:

ducon (1); KJK/USA (1); Wal (1)

Previous in Forum: Guidelines to Air Condition Sizing   Next in Forum: Crane Bridge Service Factor

Advertisement