Hydropower Plant 2*1650 kVA

08/28/2012 7:04 AM

Hi,

For our 2*1650 kVA hydropower plant in Nepal, what could be the rating of intake supply transformer, and as, 6.6 kv and 11 kV both are present - the generator voltage is 6.6 kV and stepped up to 11 kV. From which voltage side should the supply be taken for the distribution transformer for intake site? What could be the rating for intake transformer? In my opinion, the station transformer should be around 135 kVA, and the intake transformer should be around 350 kVA for 30 ampers of load at 6.6 kV. For 11 kV, for 30 amperes of load, the kVA rating will be higher.

Regards,

sks

Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru
United Kingdom - Member - New Member

Join Date: Aug 2010
Location: Resting under the Major Oak
Posts: 4347
Good Answers: 181
#1

Re: Hydropower Plant 2*1650 kVA

08/28/2012 7:39 AM

Are we talking about the supply required from the grid for plant start up? If we are take it from the grid voltage. If not please explain a bit more.

__________________
The reports of my death are greatly exaggerated.
Register to Reply
Guru
United Kingdom - Member - Indeterminate Engineering Fields - Control Engineering - New Member

Join Date: Jan 2007
Location: In the bothy, 7 chains down the line from Dodman's Lane level crossing, in the nation formerly known as Great Britain. Kettle's on.
Posts: 32175
Good Answers: 839
#2

Re: Hydropower Plant 2*1650 kVA

08/28/2012 10:06 AM

<...From which voltage side should the supply be taken for the distribution transformer for intake site?...>

What are the available voltages?

Is it time to farm-out the job to a local specialist instead of designing it with a CR4 Committee?

__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
Register to Reply
Guru
United Kingdom - Member - New Member

Join Date: Aug 2010
Location: Resting under the Major Oak
Posts: 4347
Good Answers: 181
#3
In reply to #2

Re: Hydropower Plant 2*1650 kVA

08/28/2012 1:19 PM

We'd have to farm out sauravbabu's imagination, it's the only place this power plant exists.

__________________
The reports of my death are greatly exaggerated.
Register to Reply