Rediogry Testing (RT) in Piping

11/01/2012 7:47 AM

Who will Decide RT % in piping?

Whether engineering or Quality Department.

Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru
Engineering Fields - Piping Design Engineering - Retired Piper

Join Date: Feb 2007
Location: Bayonet Point, Florida
Posts: 635
Good Answers: 61
#1

Re: Rediogry Testing (RT) in Piping

11/01/2012 11:05 AM

First- The Applicable Piping Code

Second- The QA/QC Department

__________________
Do it once and do it right
Register to Reply
Guru
Technical Fields - Technical Writing - New Member Engineering Fields - Piping Design Engineering - New Member

Join Date: May 2009
Location: Richland, WA, USA
Posts: 21017
Good Answers: 795
#2

Re: Radiography Testing (RT) in Piping

11/01/2012 2:15 PM

Follow the most stringent of 1) applicable piping codes, 2) contract documents, and 3) internal QA/QC.

Editorial note: Radiography.

__________________
In vino veritas; in cervisia carmen; in aqua E. coli.
Register to Reply
Active Contributor

Join Date: Aug 2012
Posts: 11
#3
In reply to #2

Re: Radiography Testing (RT) in Piping

11/01/2012 11:35 PM

Thank you for your reply

But I have one more query that RT % is based on Joint efficiency. & How QA/QC dept. will define joint efficiency.

Please explain in details.

Register to Reply
Guru
United Kingdom - Member - Indeterminate Engineering Fields - Control Engineering - New Member

Join Date: Jan 2007
Location: In the bothy, 7 chains down the line from Dodman's Lane level crossing, in the nation formerly known as Great Britain. Kettle's on.
Posts: 32175
Good Answers: 839
#4
In reply to #3

Re: Radiography Testing (RT) in Piping

11/02/2012 4:37 AM

QA/QC is not there to define the joint efficiency. It is there to make sure there is evidence gathered that the applicable code/applicable specification has been followed.

__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
Register to Reply
Active Contributor

Join Date: Aug 2012
Posts: 11
#5
In reply to #4

Re: Radiography Testing (RT) in Piping

11/02/2012 4:45 AM

Agreed sir

but My question is still open means how quality people will decide how much percentage of Radiography testing ( RT % ) to be done in piping

Please elaborate.

Register to Reply
Guru
United Kingdom - Member - Indeterminate Engineering Fields - Control Engineering - New Member

Join Date: Jan 2007
Location: In the bothy, 7 chains down the line from Dodman's Lane level crossing, in the nation formerly known as Great Britain. Kettle's on.
Posts: 32175
Good Answers: 839
#6
In reply to #5

Re: Radiography Testing (RT) in Piping

11/02/2012 8:26 AM

See #4↑. QA/QC isn't there to do that either.

__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
Register to Reply
Guru
Technical Fields - Technical Writing - New Member Engineering Fields - Piping Design Engineering - New Member

Join Date: May 2009
Location: Richland, WA, USA
Posts: 21017
Good Answers: 795
#7

Re: Rediogry Testing (RT) in Piping

11/02/2012 9:58 AM

In the U.S. boiler and pressure vessel code, you may claim 70% weld efficiency if no RT is conducted, 85% if spot RT, and 100% if full RT. Unless the RT is required, the decision is an economic choice.

__________________
In vino veritas; in cervisia carmen; in aqua E. coli.
Register to Reply
Active Contributor

Join Date: Aug 2012
Posts: 11
#8
In reply to #7

Re: Rediogry Testing (RT) in Piping

11/02/2012 11:55 PM

Thank you for your answer.

Please explain how to calculate Joint efficiency? or on which basis joint effieciency will be calculated?

Register to Reply
Guru
Technical Fields - Technical Writing - New Member Engineering Fields - Piping Design Engineering - New Member

Join Date: May 2009
Location: Richland, WA, USA
Posts: 21017
Good Answers: 795
#9
In reply to #8

Re: Rediogry Testing (RT) in Piping

11/03/2012 12:20 AM

It isn't calculated; it is simply prescribed based on what portion of RT is done; as explained in the earlier post.

__________________
In vino veritas; in cervisia carmen; in aqua E. coli.
Register to Reply
Register to Reply 9 comments
Copy to Clipboard