Hi, thanks for you help. But what about during the basic design, while we dont have required materials available, and most of importance, we dont have time in contract. Just a rough estimation is OK. Let's say, the cables are 500 tons, then the cable tray and accessories will be a percentage*500 tons, eg 10%*500=50 tons. Do we have that rough percentage?