Attention for Electrical engineer who Developed/Designed Electrical Infrastructure for Integrated township Development.
Dear guru Let us consider,From local electricity board we are getting power for our Development. According to the local Electricity rules upto certain demand load,The Electricity board giving 11kV or 66kV or 110kV line respectively.If suppose we are in need of 110 kV(Local electricity board) because of more demanded load in our Development.From local electricity board they will give 2 nos of 110 kV power line for Receiving station (which will be designed and developed by Electricity board in the place of our Development).RMU can be connected for 110kV voltage level .Likewise can we maintain that RMU scheme in 11kV voltage level?.If yes send me the scheme.

Note: I have a diagram which having RMU scheme only in 110 kV line not in 11kV line

Register to Reply
Pathfinder Tags: Ring main unit
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.

Good Answers:

These comments received enough positive votes to make them "good answers".
2
Guru
United Kingdom - Member - New Member

Join Date: Aug 2010
Location: Resting under the Major Oak
Posts: 4347
Good Answers: 181
#1

Re: Ring Main Unit

12/06/2012 8:36 AM
__________________
The reports of my death are greatly exaggerated.
Register to Reply Good Answer (Score 2)
2
Guru
United Kingdom - Member - Indeterminate Engineering Fields - Control Engineering - New Member

Join Date: Jan 2007
Location: In the bothy, 7 chains down the line from Dodman's Lane level crossing, in the nation formerly known as Great Britain. Kettle's on.
Posts: 32175
Good Answers: 839
#2

Re: Ring Main Unit

12/06/2012 9:50 AM

__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
Register to Reply Good Answer (Score 2)
Guru
New Zealand - Member - Kiwi Popular Science - Weaponology - New Member Engineering Fields - Power Engineering - New Member Engineering Fields - Electrical Engineering - New Member

Join Date: Sep 2006
Location: Auckland, New Zealand
Posts: 8777
Good Answers: 376
#3

Re: Ring Main Unit

12/06/2012 1:40 PM

Short answer is obviously no for both homework/general interest questions. A substation is not some black box that just takes one voltage and spits out another using ohms law.

__________________
jack of all trades
Register to Reply
Guru
Safety - ESD - New Member India - Member - New Member Engineering Fields - Energy Engineering - New Member

Join Date: May 2007
Location: Pune , India
Posts: 875
Good Answers: 42
#4

Re: Ring Main Unit

12/06/2012 2:13 PM

When your Factory or township is fed from two different substations of Public Electricity Board ( Government or Corporation) or Private Electric Company they make a ring main system for the benefit of both the supplier and the customer. But if two interdependent feeders are extended to the customers premises from single source( same substation) it is for the customer to design their own suitable ring main system for their benefit depending on the load pattern, distribution system, location of the substations and the available financial resources. If you want total capacity single ring main then the cable network has to cater for full capacity of the connected load of the customer which is a costlier design. Instead you can have two different ring main systems . You can have half the substations on one side of the bus with first incomer and other half with the second incomer and have a bus coupler in the middle. So the design will depend on local conditions.

Register to Reply
Guru
United States - Member - New Member

Join Date: Jun 2008
Location: Alabama
Posts: 1604
Good Answers: 63
#5

Re: Ring Main Unit

12/06/2012 2:48 PM

Are you installing one substation or two, not that it matters. You are given a maximum demand from the Electrical Board. Your job is to ensure you do not exceed that demand. It does no matter which side you monitor. IF you have 2 subs there is equipment that will allow you to integrate the demands of both to obtain the total maximum. I would think the 11 kv side would be cheaper.

Register to Reply
Guru

Join Date: Jun 2010
Location: srilanka
Posts: 2725
Good Answers: 5
#6

Re: Ring Main Unit

12/07/2012 1:14 AM

If the rated voltage of equipments like motors in the factory is 400, locate package substations(11kV/400)around the factory.

__________________
pnaban
Register to Reply
Active Contributor

Join Date: Oct 2010
Location: Hyd - IND
Posts: 21
#7

Re: Ring Main Unit

12/07/2012 1:46 AM

See Mr. Muthuvel,

u have asked yes or no questions - "RMU can be connected for 110kV voltage level" - YES it can be connected.

"Likewise can we maintain that RMU scheme in 11kV voltage level" - YES it can be maintained in 11KV RMU.

i cant able to understand the meaning of "SCHEME" wheather u are asking the detailed / complete ring main grid / circuit with all specifications?

__________________
Shaju Khan
Register to Reply
Power-User

Join Date: Jun 2012
Posts: 115
#11
In reply to #7

Re: Ring Main Unit

01/17/2013 1:51 AM

Dear Mr.Shajahan

If you can connect RMU in 110kV voltage level and 11kv in same substation.Kindly send me the that Single line diagram of the sub-station from 110kV voltage level to 11kv voltage level(note:that sub-station should be approved and executed without any problem)

Register to Reply
Commentator

Join Date: Dec 2011
Posts: 67
#8

Re: Ring Main Unit

12/07/2012 4:35 AM
Register to Reply
Member

Join Date: Aug 2011
Posts: 5
#9

Re: Ring Main Unit

12/07/2012 8:45 AM

RMU is available up to 22-34.5 kV.

Register to Reply
Commentator
France - Member - New Member

Join Date: Feb 2012
Location: Grenoble, France
Posts: 76
Good Answers: 4
#10

Re: Ring Main Unit

12/10/2012 8:00 AM

I do not see how, even with 110KV available, you can do without a 11 KV (or 22KV or even 36KV - as in Spain) loop, on which you will connect MV/LV transformers with RMUs.

Register to Reply
Register to Reply 11 comments

Good Answers:

These comments received enough positive votes to make them "good answers".
Copy to Clipboard

Users who posted comments:

Drton (1); iftikhar129 (1); jack of all trades (1); Muthuvel (1); obouill (1); pnaban (1); PWSlack (1); TonyS (1); user-deleted-1076 (1); V.I.Abraham (1); wareagle (1)

Previous in Forum: Short Circuit Rating of Cable   Next in Forum: European Equivalent to IPC2221 PWB Design

Advertisement