Previous in Forum: Pilot Torch   Next in Forum: Makeup Water Tank
Close
Close
Close
4 comments
Rate Comments: Nested
Associate
Hobbies - RC Aircraft - New Member

Join Date: Jan 2013
Location: India
Posts: 27

Sewage Treatment Plant

04/18/2013 5:59 AM

Hi,

The continuous flow of STP exhaust air at the ground level is contaminating the nearby environment. Is there a formula for calculating the height of the chimney that needs to be connected to the exhaust of the STP, just like how we have for DG stack.

__________________
If it is to be, it is upto me
Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Anonymous Poster #1
#1

Re: Sewage Treatment Plant

04/18/2013 6:15 AM
Register to Reply
Guru
United Kingdom - Member - Indeterminate Engineering Fields - Control Engineering - New Member

Join Date: Jan 2007
Location: In the bothy, 7 chains down the line from Dodman's Lane level crossing, in the nation formerly known as Great Britain. Kettle's on.
Posts: 32175
Good Answers: 839
#2

Re: Sewage Treatment Plant

04/18/2013 6:49 AM

Think about a formula to calculate the size of the proposed odour control plant.

__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
Register to Reply
Associate
Hobbies - RC Aircraft - New Member

Join Date: Jan 2013
Location: India
Posts: 27
#3

Re: Sewage Treatment Plant

04/18/2013 7:26 AM

@ Anonymous...it didnt help

@P...i dont know so was asking if someone knew...kindly read..

__________________
If it is to be, it is upto me
Register to Reply
Anonymous Poster #1
#4

Re: Sewage Treatment Plant

04/18/2013 7:30 AM
Register to Reply
Register to Reply 4 comments
Copy to Clipboard

Users who posted comments:

Anonymous Poster (2); goldenboy_gin (1); PWSlack (1)

Previous in Forum: Pilot Torch   Next in Forum: Makeup Water Tank

Advertisement