Backup Overcurrent Protection

06/15/2013 1:23 AM

can anybody help me working out settings for voltage restrained overcurrent protection?

I want guidelines on how to calculate both voltage levels? current setting and TMS are already worked out.

Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru

Join Date: Oct 2009
Posts: 2061
Good Answers: 169
#1

Re: Backup overcurrent protection

06/15/2013 3:18 AM

What about the manufacturer's instruction manual?

Register to Reply
Associate

Join Date: Mar 2013
Posts: 31
#2
In reply to #1

Re: Backup overcurrent protection

06/15/2013 5:24 AM

relay is micom p343, it suggest that set the voltage threshold, V Dep OC V<2 Set to a value above the voltage measured at the relay and upper voltage threshold setting, V Dep OC V<1 Set, should be set below the minimum corrected phase-phase voltage level for a close-up HV earth fault.

But through this information I am not able to make out. Plz help

Register to Reply
Commentator

Join Date: Aug 2008
Posts: 82
#3
In reply to #2

Re: Backup overcurrent protection

06/15/2013 1:44 PM

If voltage is being measured in range as 395 V to 412 V ; this Upper voltage threshold is to be set below 395 V (1) .

More than 412 V , this voltage threshold(2) is to be set .

Register to Reply
Associate

Join Date: Mar 2013
Posts: 31
#4
In reply to #3

Re: Backup overcurrent protection

06/17/2013 5:02 AM

PT secondary is 110 v, then what should be the settings?

Register to Reply
Commentator

Join Date: Aug 2008
Posts: 82
#5
In reply to #4

Re: Backup overcurrent protection

06/17/2013 12:20 PM

Considering the phase to phase voltage as 110 ;

104 V as Below 110 can be opted - provided we are not getting this reading in loaded / fully loaded / start up - condition ( normal ) .

120 V as above 110 V may be chosen based on no load / min load condition - being measured in different shift timings .

If volage and upper voltage threshold required for us is being interchanged , overcurrent protection will be activated . In that case , interchange these values as well - please .

Phase to phase voltage if is different , work out the value in a similar way . Regards .

Register to Reply
Register to Reply 5 comments
Copy to Clipboard

Users who posted comments:

electricalexpert65 (1); sivaa (2); vyral2311 (2)

Previous in Forum: How To Solve Problem on ETAP Wind Turbine Generator Simulation   Next in Forum: OMRON 's Inverter V1000

Advertisement