I m in construction field, when i observe main schematic drawing they will use ACCL, i want to know what is the use of Automatic change over current limiter(ACCL), where we can use.
You said that " when you observe main schematic drawing they will use ACCL,...". if they are concered about your observation, please dont observe. So they will stop using the ACCL
__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
"Automatic Changeover-cum-Current Limiter has the following function:
The ACCL allows unrestricted supply from mains.
When the main supply fails and stand by Generator supply is on, it connects the DG power to each consumer in sequence & starts monitoring its load.
The generator current allotment is software calibrated in Amps & sealed in each ACCL as per buyer's specification & is available on all load circuits.
When ever the load current exceeds the allotment, power is automatically switched off for 8/10/12 seconds, and then automatically restored."
well what I dont understand is - what happens during those 8-12 seconds, consumer has blackout and accepts this as ok ???