Technical Justification of Crawling Excavators Marching Limit Per Day

12/11/2014 9:00 AM

I want to justify my crawling excavators marching limit per day? because every day it was marched more than one to two km per day (by client) it will cause frequent breakdown. so I want to technical justify this issue to minimize the crawling. please help me to justify.

Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.

Good Answers:

These comments received enough positive votes to make them "good answers".
Guru
Hobbies - CNC - New Member Hobbies - DIY Welding - New Member Engineering Fields - Electromechanical Engineering - New Member

Join Date: Aug 2007
Posts: 23647
Good Answers: 420
#1

Re: technical justification of crawling excavators marching limit per day

12/11/2014 9:02 AM

justify in what way, faster/slower?

any positive justification removes from other properties.

__________________
“ When people get what they want, they are often surprised when they get what they deserve " - James Wood
Register to Reply
Active Contributor

Join Date: Sep 2014
Posts: 19
#9
In reply to #1

Re: technical justification of crawling excavators marching limit per day

12/11/2014 7:01 PM

If the equipment used for doing excavation is well and good but it is used to marching here and there for 1 or . Km/10

cubic meter excavation what I am asking is there any limits for marching of excavator per day operation basis?

Register to Reply
Guru

Join Date: Oct 2008
Posts: 42355
Good Answers: 1693
#10
In reply to #9

Re: technical justification of crawling excavators marching limit per day

12/11/2014 7:29 PM

ASK THE MAKERS OF THE EQUIPMENT!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!

Register to Reply
Guru

Join Date: Oct 2008
Posts: 42355
Good Answers: 1693
#2

Re: technical justification of crawling excavators marching limit per day

12/11/2014 9:20 AM

You should ask the manufacturer for the operator's manual and for their advice on use limits, if any.

This, of course, should already be at hand in the office of the maintenance supervisor.

That last sentence is wasted on you, I know.

In plain English, you should already know this!!!!!!!!!!!!!!!!!!!!

Why ask strangers to do your job for you??

Register to Reply
Guru
Engineering Fields - Electrical Engineering - Been there, done that. Engineering Fields - Control Engineering - New Member

Join Date: Dec 2008
Location: Long Island NY
Posts: 15601
Good Answers: 981
#3

Re: technical justification of crawling excavators marching limit per day

12/11/2014 9:23 AM

If the manufacturer of excavator recommends a limit, you are done. If you recommended it but cannot justify why you recommend it then you are done in an unhappy way. If somebody else recommended it, ask them not us.

As for my opinion, I prefer left hand justification for English text.

__________________
"Don't disturb my circles." translation of Archimedes last words
Register to Reply
Guru
Hobbies - Fishing - Old Salt Hobbies - CNC - New Member United States - US - Statue of Liberty - New Member

Join Date: Mar 2007
Location: Rosedale, Maryland USA
Posts: 5197
Good Answers: 266
#4

Re: technical justification of crawling excavators marching limit per day

12/11/2014 9:25 AM

Moving parts wear. The more they move the more they wear. By your post you don't want them to wear out. So with draw your equipment shut your doors and go home. Problem solved!

As a contractor renting your equipment if you placed restrictions on it's use. I would go else where to rent. As I also have a contract to complete a job. Time is money and your putting restriction on your equipment use will cost me.

So it seems in the idea to cut cost of repairs. You want to place restriction. Might as well close up and go home.

Most companies that lease equipment figure into the lease price the cost of maintaining the equipment.

__________________
Life is not a journey to the grave with the intention of arriving in a pretty, pristine body but rather to come sliding in sideways, all used up and exclaiming, "Wow, what a ride!"
Register to Reply
Guru
Popular Science - Weaponology - New Member Fans of Old Computers - PDP 11 - New Member Technical Fields - Architecture - New Member Hobbies - HAM Radio - New Member

Join Date: Oct 2009
Location: Maine, USA
Posts: 2168
Good Answers: 71
#5

Re: Technical Justification of Crawling Excavators Marching Limit Per Day

12/11/2014 10:32 AM

Bill them a "service charge" for excess KM. If they don't like it they will go elsewhere. How does your competition do it?

__________________
Tom - "Hoping my ship will come in before the dock rots!"
Register to Reply
Guru
Technical Fields - Technical Writing - New Member Engineering Fields - Piping Design Engineering - New Member

Join Date: May 2009
Location: Richland, WA, USA
Posts: 21017
Good Answers: 795
#6

Re: Technical Justification of Crawling Excavators Marching Limit Per Day

12/11/2014 12:30 PM

Rent by distance rather than time.

__________________
In vino veritas; in cervisia carmen; in aqua E. coli.
Register to Reply
Guru
New Zealand - Member - Kiwi Popular Science - Weaponology - New Member Engineering Fields - Power Engineering - New Member Engineering Fields - Electrical Engineering - New Member

Join Date: Sep 2006
Location: Auckland, New Zealand
Posts: 8777
Good Answers: 376
#7

Re: Technical Justification of Crawling Excavators Marching Limit Per Day

12/11/2014 1:40 PM

What's your contract with the customer say?

__________________
jack of all trades
Register to Reply
Active Contributor

Join Date: Sep 2014
Posts: 19
#8
In reply to #7

Re: Technical Justification of Crawling Excavators Marching Limit Per Day

12/11/2014 6:47 PM

Amount $ per hour of operations

Register to Reply
Guru
New Zealand - Member - Kiwi Popular Science - Weaponology - New Member Engineering Fields - Power Engineering - New Member Engineering Fields - Electrical Engineering - New Member

Join Date: Sep 2006
Location: Auckland, New Zealand
Posts: 8777
Good Answers: 376
#11
In reply to #8

Re: Technical Justification of Crawling Excavators Marching Limit Per Day

12/11/2014 9:23 PM

Sooo nothing in the contract preventing the customer from, say getting a couple of crawlers and having a drag race or driving cross country to the local liquor store for beers?

Ask crawler manufacturer for their opinion on the limits and pass that through to the customer and add it into future contracts.

Don't expect the customer to automatically listen to you however if your current contract is too broad, the customer is more interested in saving themselves money not you.

__________________
jack of all trades
Register to Reply
Guru

Join Date: Jun 2010
Location: srilanka
Posts: 2725
Good Answers: 5
#12

Re: Technical Justification of Crawling Excavators Marching Limit Per Day

12/12/2014 12:02 AM

It should have a set of wheels to travel on roads, in addition to its track for fieldwork.

__________________
pnaban
Register to Reply
Guru

Join Date: Mar 2007
Location: City of Light
Posts: 3943
Good Answers: 183
#13

Re: Technical Justification of Crawling Excavators Marching Limit Per Day

12/12/2014 5:33 AM

First question is what parts break down ?

Why does the user run 2 km a day ? In general a crawler works on a spot for a longer period of time and then it is moved between working places when for instance its arm is not any more able to do the job. 2 km a day is on my modest opinion (I only was involved in repair of crawlers) a lot it has to be understood why it is necessary to do it.

By the way the other remarks are OK.

Register to Reply
Participant

Join Date: Dec 2014
Location: DFW, TX
Posts: 1
#15
In reply to #13

Re: Technical Justification of Crawling Excavators Marching Limit Per Day

12/12/2014 9:11 AM

I agree , what parts and cost are incurred ?

What does the equipment manufacture recommend and how old is this equipment ?

Start with a 80 % factor and shorten distance till you are back to making a profit or repair cost is manageable.

__________________
not of this world ... Romans 12:2
Register to Reply
Power-User

Join Date: Dec 2013
Posts: 201
Good Answers: 5
#14

Re: Technical Justification of Crawling Excavators Marching Limit Per Day

12/12/2014 5:36 AM

Assuming ( making an ass of you and me) that you rent these machines under contract to a company and that you have a fixed contract there is little you can do till the contract is completed. I am not a lawyer but one might help. You can talk to the hirers and explain the necessity to limit daily crawling to prevent down time. Next time make sure your contract covers this and other major pitfalls of a hire contract. Did a lawyer draw up this contract? If this is not the scenario and it is a daily hire then simply add this to the daily hire agreement. A crawler of any description has a finite life. This is usually based on its useful life span. For example, a 10000 dollar machine has a life span of 5 years at so much work a day, Double this work it will last only 2.5 years with a residue of 5000 dollars in the red) It is not a totally linear relationship but close enough. Can you replace a machine on down time or will you forfeit your contract or will the hirer suffer the cost of non production during this down time. It might be cheaper to supply transportation to move the crawler to the job site rather than walk it. I hope this gives you some ideas.

Register to Reply
Active Contributor

Join Date: Sep 2014
Posts: 19
#22
In reply to #14

Re: Technical Justification of Crawling Excavators Marching Limit Per Day

12/12/2014 7:43 PM

Thanks

Register to Reply
Guru

Join Date: Jul 2006
Location: CA (Central Arkansas, USA)
Posts: 599
Good Answers: 10
#16

Re: Technical Justification of Crawling Excavators Marching Limit Per Day

12/12/2014 5:48 PM

Any marching is going to take time and cause wear. The question is 'Why are they marching?' Is it to get closer to the lunch wagon or is that where the excavation is? You can't dig a hole over there if the machine is here. So, the economics comes in by analyzing, 'Does the cost of loading and transporting the machine offset the cost of wear on the machine.' (I'm a refrigeration guy, not an excavation guy. Am I missing something?) -- JHF

__________________
If it's too good to be true, it probably isn't
Register to Reply
Guru

Join Date: Oct 2008
Posts: 42355
Good Answers: 1693
#17

Re: Technical Justification of Crawling Excavators Marching Limit Per Day

12/12/2014 6:18 PM

Maybe you should offer a dump truck in the rental so the crawler wound not have to carry the dirt to the dump site.

Register to Reply
2
Guru

Join Date: Jun 2009
Location: South of Minot North Dakota
Posts: 8376
Good Answers: 775
#18

Re: Technical Justification of Crawling Excavators Marching Limit Per Day

12/12/2014 6:55 PM

I'm just not buying the whole marching excuse myself.

Reason being that the vast majority of track and related undercarriage drive components used on excavator tracks be them metal or rubber are also used on crawlers, dozers tracked skid steers and so forth that do nothing but drive and turn all day, and while most often heavily loaded, to do their jobs.

What I am suspecting is that someone has a number of now well worn machines that are easy money makers, being they have more than likely paid themselves off a few times over, that now require a moderate investment for proper higher dollar components of which the owner is too cheap to be willing to do so and thus is looking for justification to blame the customer for the wear and tear.

Register to Reply Good Answer (Score 2)
Guru

Join Date: Oct 2008
Posts: 42355
Good Answers: 1693
#19
In reply to #18

Re: Technical Justification of Crawling Excavators Marching Limit Per Day

12/12/2014 7:15 PM

Always the skeptic.

Probably right, too.

I can't imagine why they'd build them with weak undercarriages either.

Register to Reply
Guru

Join Date: Jun 2009
Location: South of Minot North Dakota
Posts: 8376
Good Answers: 775
#21
In reply to #19

Re: Technical Justification of Crawling Excavators Marching Limit Per Day

12/12/2014 7:35 PM

Not so skeptical just over experienced in working around cheap business owners/managers that cut their own hand off that they used to feed themselves to save/make a buck in the short term.

One of my first rules of successful business practices is never place restrictions on what your customers can do with your product when selling it to them. Someone else will always be too happy to take your business away at your expense.

Register to Reply
Guru
Engineering Fields - Power Engineering - New Member

Join Date: May 2007
Location: NYC metropolitan area.
Posts: 3230
Good Answers: 444
#20
In reply to #18

Re: Technical Justification of Crawling Excavators Marching Limit Per Day

12/12/2014 7:17 PM

TCM, I believe that we're getting closer to what really happened, basically OP was the low bidder by a wide margin, and his customer was more than willing to take advantage of OP's poor pricing model.

Live and learn.

__________________
“Tell me and I forget. Teach me and I remember. Involve me and I learn.” Ben Franklin.
Register to Reply
Guru
United States - Member - Hobbies - Fishing - New Member Hobbies - Target Shooting - New Member Hobbies - RC Aircraft - New Member Engineering Fields - Aerospace Engineering - New Member

Join Date: May 2009
Location: Saint Helens, Oregon
Posts: 2216
Good Answers: 70
#23
In reply to #18

Re: Technical Justification of Crawling Excavators Marching Limit Per Day

12/12/2014 9:57 PM

GA I think you nailed that one on the cleat If his equipment was properly maintained, worn parts replaced in a timely manner, he would be here asking such a .......

It takes money to make money, nobody rides for free

__________________
Confucius once said, “ Ability will never catch up with the demand for it".
Register to Reply
Register to Reply 23 comments

Good Answers:

These comments received enough positive votes to make them "good answers".
Copy to Clipboard

Users who posted comments:

Circuit Breaker (1); dj95401 (1); jack of all trades (2); lyn (4); muthuk10 (3); nick name (1); ozzb (1); phoenix911 (1); pnaban (1); prof peanut (1); RAMConsult (1); redfred (1); rtplatt (1); tcmtech (2); Tom_Consulting (1); Tornado (1)

Previous in Forum: 800 MW Boiler Reheater Outlet Steam Temperature Low   Next in Forum: Technical Solution to Reduce Wood Fuel Burn for a Boiler

Advertisement