Substation Cut Out Inputs

03/15/2015 7:48 AM

What are the inputs required to prepare the substation cut out details.

Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru

Join Date: Mar 2012
Location: Out of your mind! Not in sight!
Posts: 4424
Good Answers: 108
#1

Re: What are the inputs required to prepare the substation cut out details.

03/15/2015 8:46 AM

You are way over your head here.

Cut out the substation first and then look at the inputs.

Is it maybe possible that you send the full scope of work that has been assigned to you so we can find professional help?

You will need to pay a consultant to do your work.

__________________
Common Sense Dictates
Register to Reply
Guru

Join Date: Oct 2008
Posts: 42355
Good Answers: 1693
#2

Re: What are the inputs required to prepare the substation cut out details.

03/15/2015 11:43 AM

You are obviously NOT QUALIFIED to be asking these questions and most certainly NOT QUALIFIED to be working on or designing such systems.

Now, go away, before you kill someone.

Register to Reply
Guru

Join Date: Mar 2007
Location: by the beach in Florida
Posts: 33392
Good Answers: 1817
#3

Re: What are the inputs required to prepare the substation cut out details.

03/15/2015 4:13 PM

__________________
All living things seek to control their own destiny....this is the purpose of life
Register to Reply
Guru
New Zealand - Member - Kiwi Popular Science - Weaponology - New Member Engineering Fields - Power Engineering - New Member Engineering Fields - Electrical Engineering - New Member

Join Date: Sep 2006
Location: Auckland, New Zealand
Posts: 8777
Good Answers: 376
#4

Re: What are the inputs required to prepare the substation cut out details.

03/15/2015 4:43 PM

Get whatever company you work for to hire a professional consultant, given the questions you are asking on CR4 you should NOT be performing this kind of incredibly dangerous work.

__________________
jack of all trades
Register to Reply
Guru

Join Date: Oct 2008
Posts: 42355
Good Answers: 1693
#5

Re: Substation Cut Out Inputs

03/15/2015 11:57 PM

Somebody had to do it.

Register to Reply
Guru
Hobbies - DIY Welding - Don't Know What Made The Old Title Attractive... Popular Science - Weaponology - New Member United States - US - Statue of Liberty - 60 Year Member

Join Date: Apr 2009
Location: Yellowstone Valley, in Big Sky Country
Posts: 7425
Good Answers: 295
#6
In reply to #5

Re: Substation Cut Out Inputs

03/16/2015 12:07 PM

Hey... can you make those out of bacon?

__________________
Semper Ubi Sub Ubi
Register to Reply
Guru

Join Date: Oct 2008
Posts: 42355
Good Answers: 1693
#7
In reply to #6

Re: Substation Cut Out Inputs

03/16/2015 5:20 PM

Sure. Regular or crispy?

Register to Reply
Guru
Hobbies - DIY Welding - Don't Know What Made The Old Title Attractive... Popular Science - Weaponology - New Member United States - US - Statue of Liberty - 60 Year Member

Join Date: Apr 2009
Location: Yellowstone Valley, in Big Sky Country
Posts: 7425
Good Answers: 295
#8
In reply to #7

Re: Substation Cut Out Inputs

03/17/2015 2:27 PM

Mmmmmm... bacon shirts!

__________________
Semper Ubi Sub Ubi
Register to Reply
Guru
New Zealand - Member - Kiwi Popular Science - Weaponology - New Member Engineering Fields - Power Engineering - New Member Engineering Fields - Electrical Engineering - New Member

Join Date: Sep 2006
Location: Auckland, New Zealand
Posts: 8777
Good Answers: 376
#9
In reply to #8

Re: Substation Cut Out Inputs

03/17/2015 2:39 PM

Their all the rage down in the Hamptons.

__________________
jack of all trades
Register to Reply
Guru
Safety - ESD - New Member India - Member - New Member Engineering Fields - Energy Engineering - New Member

Join Date: May 2007
Location: Pune , India
Posts: 875
Good Answers: 42
#10

Re: Substation Cut Out Inputs

03/20/2015 10:25 AM

What do you mean by Substation cut out ? In the first place the question appears to be a question put up to you in interview/ test which you did not understand and want some one here in this forum to explain to you . Normally a circuit breaker is installed at the incoming Cable or Overhead line feeder to the substation which is used to switch On/ switch Off power to the Substation .It can a ACB, OCB, MOCB, VCB etc depending up on the Voltage and kVA / MVA capacity of the Substation( Indoor / Outdoor) . So all details are required to give you a technical answer. So study your problem understand it and come back with a question.

Register to Reply
Register to Reply 10 comments
Copy to Clipboard

Users who posted comments:

Doorman (2); IdeaSmith (1); jack of all trades (2); lyn (3); SolarEagle (1); V.I.Abraham (1)

Previous in Forum: What is the Minimum Safe Distance to Locate a Substation from a Classified Plant   Next in Forum: 60Hz, 220-240 V Treadmill

Advertisement