Anonymous Poster #1

Tools & Plants List Required Boiler Re-Tubing Job

04/05/2015 10:31 AM

Hi Friends,

I am going to execute re-tubing job for FM 175 Babcok & Willcox Boiler some one can help me about Tool & Plants required to execute this job, site re-tubing of R Stamp standard.

Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.

Good Answers:

These comments received enough positive votes to make them "good answers".

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Guru

Join Date: Oct 2008
Posts: 42355
Good Answers: 1693
#1

Re: Tools & Plants List required Boiler Re tubing Job.

04/05/2015 10:40 AM

1. Babcok & Willcox can.

2. Any competent boiler repair tech. can

3. An internet search can.

Given your lack of knowledge of the subject, I'd look for other, easier work, if I were you.

Anonymous posters usually aren't very reliable, since they can't be identified, even if someone wanted to supply you with information you should have had before taking on the job.

Good luck.

Reply
Guru

Join Date: Mar 2012
Location: Out of your mind! Not in sight!
Posts: 4424
Good Answers: 108
#2
In reply to #1

Re: Tools & Plants List required Boiler Re tubing Job.

04/05/2015 10:55 AM

Yupp and good luck to OP.

__________________
Common Sense Dictates
Reply
Guru

Join Date: Oct 2008
Posts: 42355
Good Answers: 1693
#3
In reply to #2

Re: Tools & Plants List required Boiler Re tubing Job.

04/05/2015 11:47 AM

OP will need divine intervention, too.

Reply
2
Guru
Engineering Fields - Mechanical Engineering - New Member

Join Date: May 2008
Location: CHENNAI, TAMIL NADU, INDIA.
Posts: 1851
Good Answers: 65
#4

Re: Tools & Plants List required Boiler Re tubing Job.

04/05/2015 12:14 PM

First Legal requirement - you should be an approved legally certified Boiler Repairer, which has Grade-I, Grade-II, Etc. - issued by respective competent authority of the Boiler Department. Each country has its own standards and rules and regulations, which you have to satisfy the regulations.

Or else, you can not take up and do any job like re-tubing which is a pressure part. If your work involves some welding, in the pressure part, the welder should be certified welder and you cannot engage ordinary welder.

DHAYANANDHAN.S

Reply Good Answer (Score 2)
Guru
Technical Fields - Technical Writing - New Member Engineering Fields - Piping Design Engineering - New Member

Join Date: May 2009
Location: Richland, WA, USA
Posts: 21017
Good Answers: 795
#5

Re: Tools & Plants List required Boiler Re tubing Job.

04/05/2015 1:07 PM

Unless you (or your contractor) are registered as an "R" shop, you can't do this work. Simply following a repair procedure is not enough; you must also satisfy a registration procedure beforehand.

__________________
In vino veritas; in cervisia carmen; in aqua E. coli.
Reply
Guru

Join Date: Jan 2010
Location: Mineral wells Tx
Posts: 630
Good Answers: 34
#6

Re: Tools & Plants List required Boiler Re tubing Job.

04/05/2015 1:50 PM

In addition of Lyn, Dhayanandhan and Tornado Indications. Check this Link:

http://www.thomasnet.com/products/boiler-repair-services-6091409-1.html

Reply
Guru
Popular Science - Weaponology - New Member

Join Date: Jan 2013
Posts: 650
Good Answers: 16
#7

Re: Tools & Plants List Required Boiler Re-Tubing Job

04/05/2015 10:49 PM

The old boy made this steam engine boiler for a model engine 75 years ago for R&R while in an engineering army unit. It was 'protected' in asbestos cladding. No, it is not to be rebuilt. It could be copied by professionals for reasons of safety as previously mentioned.

Yes, the model engine made from a hydraulic brake assembly as a piston etc still exists .... works well running on compressed air.

__________________
DY
Reply
Associate

Join Date: Jan 2010
Location: Adelaide South Australia
Posts: 40
#8

Re: Tools & Plants List Required Boiler Re-Tubing Job

04/05/2015 11:08 PM

If it was a Locomotive type boiler I could tell you what you need but i am not familiar with FM 175 Babcock and Wilcox boiler. you will I suspect need tube expander rollers plus rotary flap sanders to polish the tube holes after old tubes have been extracted either by chiseling them out or some type of extracting tool.

if the tubes are welded on the ends to the tube plate you will have to cut the welds with a chisel and then smooth the area by grinding and then get a certified pressure vessel welder to weld the new tubes to the tube plate

working in a Loco fire box to do this job is dirty and messy and some tubes are diabolical to get at Hours spent in cramped conditions doing this

Cheers

Peugeot man

__________________
" For also knowledge itself is power." -- Francis Bacon
Reply
Guru

Join Date: Jul 2006
Location: CA (Central Arkansas, USA)
Posts: 599
Good Answers: 10
#9

Re: Tools & Plants List Required Boiler Re-Tubing Job

04/06/2015 5:28 PM

Is this a joke? -- JHF

__________________
If it's too good to be true, it probably isn't
Reply
Guru

Join Date: Oct 2008
Posts: 42355
Good Answers: 1693
#10
In reply to #9

Re: Tools & Plants List Required Boiler Re-Tubing Job

04/06/2015 5:47 PM

To everyone but the poor AP.

Reply
Associate

Join Date: Jan 2010
Location: Adelaide South Australia
Posts: 40
#11
In reply to #10

Re: Tools & Plants List Required Boiler Re-Tubing Job

04/06/2015 7:01 PM

This is not rocket science !

I was taught on the job and have expanded many tubes into firebox tube plates on Locomotive boilers to the satisfaction of inspectors. It is time consuming to have to turn the tube expander around and around many times to expand the end of the tube into the tube plate hole

In Loco type boilers the firebox tube ends are usually turned down onto the tube plate and the raw ends welded to the plate this is to stop the tube ends from getting burnt, at the smokebox end they are usually just left bell mouthed.

At worst he is likely to have a leaking tube not much chance of a new tube blowing. The boiler will have to be cold tested before use and then steam tested. I am more concerned about certificated welders laying down large pads of weld on boiler barrel outer where corrosion has occurred between the insulation and the boiler barrel

Cheers

Peugeot man

__________________
" For also knowledge itself is power." -- Francis Bacon
Reply
Guru

Join Date: Jul 2007
Location: Commissariat de Police, Nouvions, occupied France, 1942.
Posts: 2599
Good Answers: 77
#12

Re: Tools & Plants List Required Boiler Re-Tubing Job

04/07/2015 3:13 AM

IIf you need to ask such a question, then the only tool you need is a telephone so you can arrange for someone else to do the work.

__________________
Good moaning!
Reply Score 1 for Good Answer
Reply to Forum Thread 12 comments

Good Answers:

These comments received enough positive votes to make them "good answers".

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Copy to Clipboard

Users who posted comments:

Circuit Breaker (1); Crabtree (1); dhayanandhan (1); Don from Oz (1); IdeaSmith (1); lyn (3); peugeot man (2); Tornado (1); Whitephone (1)

Previous in Forum: Hydrotesting of Shell & Tube Heat Exchanger   Next in Forum: 1/2 Inch Tubing Hydro Test Required?

Advertisement