Re: Foundations, Column and beams in substation control building.
07/03/2019 7:55 AM
A Building Designer makes those sorts of decisions on the basis of local construction codes, local building regulations, local site conditions, and the Client's detailed requirements for the building in question.
__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
Re: Foundations, Column and Beams in Substation Control Building
07/08/2019 12:03 PM
In absence of all relevant dimensions, by the mystery of the bills in the "Restaurant at the End of the Universe" or for numeric summary see post #3 and "The Hitch-hiker's Guide to the Universe" books.