Previous in Forum: Help with Bending Forces for 3mm (1/8") Copper Sheet   Next in Forum: Best method for Preventive Maintenance
Close
Close
Close
Rate Comments: Nested
Anonymous Poster

Gas Turbine

08/23/2010 11:05 AM

sir , we have 5 GT of 30 ME of frame -6, but in one GT which is newly commissioning , we faced 1 problem that all 12 output of Flow divider ( impulse line) are very hot however we are running our GT in NG.

then we suspected that our purge air and HSD valve is paasing in reverse direction so we replaced it with new one with hydro test but problem is no resolve.

then what we have to do . temperature is approx 60 to 70.

Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru
United Kingdom - Member - Indeterminate Engineering Fields - Control Engineering - New Member

Join Date: Jan 2007
Location: In the bothy, 7 chains down the line from Dodman's Lane level crossing, in the nation formerly known as Great Britain. Kettle's on.
Posts: 32175
Good Answers: 839
#1

Re: Gas Turbine

08/24/2010 2:14 AM

<...GT...ME...NG...HSD...>

First step: carry out an acronymectomy.

<...temperature is approx 60 to 70...>

  • Rankine?
  • Kelvin?
  • Fahrenheit?
  • Celsius?

Next step: contact the manufacturer for advice. If the thing is newly commissioned, then it will be under warranty. Tha manufacturer will have a reputation to protect. Use that feature!

__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
Reply
Reply to Forum Thread

Previous in Forum: Help with Bending Forces for 3mm (1/8") Copper Sheet   Next in Forum: Best method for Preventive Maintenance

Advertisement