Previous in Forum: TDBFP vs. MDBFP   Next in Forum: Y.S. And Material Thickness Relationship
Close
Close
Close
2 comments
Rate Comments: Nested
Anonymous Poster

What is Average Daily Out Put for Duct and Chilled Water Piping Fabrication

09/10/2010 4:04 AM

What is the average productivity (out put) per day for duct and chilled water piping installation?

Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru
United Kingdom - Member - Indeterminate Engineering Fields - Control Engineering - New Member

Join Date: Jan 2007
Location: In the bothy, 7 chains down the line from Dodman's Lane level crossing, in the nation formerly known as Great Britain. Kettle's on.
Posts: 32209
Good Answers: 839
#1

Re: WHAT IS AVVARAGE DAILY OUT PUT FOR DUCT AND CHILLED WATER PIPING FABRICATION & I

09/10/2010 4:53 AM

Please turn off Caps Lock.

It rather depends upon the contract. If it were fixed price, the output rate will be higher than if it were time-and-materials.

__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
Reply
Guru
United States - Member - Lifelong New Yorker Popular Science - Biology - Animal Science Technical Fields - Technical Writing - Technical Writer

Join Date: Mar 2008
Location: NY
Posts: 2313
Good Answers: 59
#2
In reply to #1

Re: WHAT IS AVVARAGE DAILY OUT PUT FOR DUCT AND CHILLED WATER PIPING FABRICATION & I

09/10/2010 7:14 AM

I corrected the caps lock in the original post.

Reply Off Topic (Score 5)
Reply to Forum Thread 2 comments

Previous in Forum: TDBFP vs. MDBFP   Next in Forum: Y.S. And Material Thickness Relationship

Advertisement