How to Lift a Load with CG Misaligned to Lifting Device

10/06/2010 5:32 PM

It has often happened in real situations as shown:

What kind of rigging device would I need to avoid tilting of the weight?

Thanks

Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.

Good Answers:

These comments received enough positive votes to make them "good answers".
4
Guru
Technical Fields - Technical Writing - New Member Engineering Fields - Marine Engineering - New Member

Join Date: Sep 2008
Location: Vancleave, Ms about 30 miles inland from Biloxi and the coast
Posts: 3197
Good Answers: 106
#1

Re: How to Lift a Load with CG Misalign to Lifting Device

10/06/2010 5:45 PM
__________________
Mr.Ron from South Ms.
Register to Reply Good Answer (Score 4)
Guru
Hobbies - DIY Welding - Don't Know What Made The Old Title Attractive... Popular Science - Weaponology - New Member United States - US - Statue of Liberty - 60 Year Member

Join Date: Apr 2009
Location: Yellowstone Valley, in Big Sky Country
Posts: 7425
Good Answers: 295
#2
In reply to #1

Re: How to Lift a Load with CG Misalign to Lifting Device

10/06/2010 6:02 PM

Swish! Nothing but net from behind the 3-point line! It even looks like his illustration!

__________________
Semper Ubi Sub Ubi
Register to Reply
Guru
Hobbies - DIY Welding - New Member

Join Date: Apr 2008
Location: Bristol, Tennessee
Posts: 1177
Good Answers: 58
#3

Re: How to Lift a Load with CG Misalign to Lifting Device

10/06/2010 6:07 PM

Use slings of different lengths. Or use chain set up so it can not slip. Or set your lunch box on the weight to balance it.

My favorite set up is a double chain sling, where each chain has a chain hook on it. You can adjust each chain to the lift in question.

__________________
mike k
Register to Reply
Active Contributor
Australia - Member - New Member Engineering Fields - Mechanical Engineering - New Member

Join Date: Jan 2010
Posts: 16
Good Answers: 1
#8
In reply to #3

Re: How to Lift a Load with CG Misalign to Lifting Device

10/08/2010 1:29 AM

Chain shortenering hooks are the ticket. Wihout lifting the load, you adjust the sling lengths so that the hook is above your centre of mass.

http://rud.sdzecom.de/productgroup.php?pgsn=552131&chash=f75e62

__________________
chris@ade.net.au
Register to Reply
Guru

Join Date: Aug 2009
Location: Glen Mills, PA.
Posts: 2385
Good Answers: 114
#4

Re: How to Lift a Load with CG Misalign to Lifting Device

10/06/2010 9:21 PM

Does it matter if the load swings sideways as soon as it clears the floor? It will with the load leveler or a diagonal pull located at the center of load.

You could add load to the left end to move the center of load to be under the lift point.

__________________
In a time of universal deceit, telling the truth is a revolutionary act. George Orwell
Register to Reply
Guru
Popular Science - Weaponology - Ancient Weapon Enthusiast United States - US - Statue of Liberty - Viva la Revolucion!

Join Date: Dec 2008
Location: In the dark, somewhere in Arizona
Posts: 632
Good Answers: 15
#5

Re: How to Lift a Load with CG Misaligned to Lifting Device

10/07/2010 11:13 PM

1st, is this a homework project?

There are a variety of ways to do this, but essentially you need to grab the object from multiple points (which the load-leveler does). This can be far more involved than it seems as the CG on many loads is not readily apparent and it can shift as you start lifting.

If you are going to be lifting this object anywhere where there is the remotest possibility that it could hit someone (or their property) if it fell you need to hire a professional with a substantial liability insurance policy (or get one for yourself) so you don't find yourself paying someone's potential lifetime earnings, pain and suffering, etc...

__________________
Education is not preparation for life; life itself is education.
Register to Reply
Participant

Join Date: Oct 2010
Location: Hawaii USA
Posts: 4
Good Answers: 1
#6

Re: How to Lift a Load with CG Misaligned to Lifting Device

10/08/2010 1:10 AM

The easiest way to lift without losing control of the object is to use a spreader on the cable hook. It offsets and distributes the weight which allows for better control even if off center

Register to Reply
Associate

Join Date: Jul 2010
Location: Witbank South Africa
Posts: 44
Good Answers: 2
#7

Re: How to Lift a Load with CG Misaligned to Lifting Device

10/08/2010 1:26 AM

Two chain blocks so you can udjust the lengths of either side to keep the load level. It is a cheaper option.

__________________
If you can't cross the river, use the water to irrigate your side, the grass will soon be greener
Register to Reply
Associate

Join Date: Oct 2010
Posts: 42
Good Answers: 5
#9

Re: How to Lift a Load with CG Misaligned to Lifting Device

10/08/2010 3:41 AM

I have found these to be helpful: Load Balancer

Even so, you will always get a lateral tension and unwanted lateral acceleration when the friction between the load and ground are reduced. Such events can be very dangerous, even toppling the lifting mechanism.

Where ever possible it is preferred to get the CG's aligned even if it means adding counter weights.

Register to Reply
Power-User

Join Date: Apr 2008
Posts: 138
Good Answers: 2
#13
In reply to #9

Re: How to Lift a Load with CG Misaligned to Lifting Device

10/08/2010 8:41 AM

I agree with URAD. If this is a large bulk, the best procedure is to use counterweights. And the load balancer is a good idea if it is feasible.

We design lifting fixtures with adjustable features. This way we can manage any CG problem. Make sure your lifting device is capable to handle the load.

You can buy lifting slings with adjustable features already implemented.

Register to Reply
Participant

Join Date: Apr 2010
Posts: 1
#10

Re: How to Lift a Load with CG Misaligned to Lifting Device

10/08/2010 4:16 AM

Dear Sir,

You use one Chain Block to adjust the weight on one side, left or right.

sawadhkm

Register to Reply
Guru

Join Date: Dec 2007
Location: Mumbai, India
Posts: 1983
Good Answers: 25
#11

Re: How to Lift a Load with CG Misaligned to Lifting Device

10/08/2010 6:27 AM

Please provide full details of your application. Wt. in kg., item to be lifted, part of which machine?. After hearing from you we can suggest you solution.

__________________
"Engineers should not look for jobs but should create jobs for others" by Dr.Radhakrishnan Ex President of India during my college graduation day
Register to Reply
Anonymous Poster
#12

Re: How to Lift a Load with CG Misaligned to Lifting Device

10/08/2010 8:40 AM

Is the CL of the Load the same as the CL of the Load's weight? Does the CL of the Lifting Device line up with the CL of the Load?

Register to Reply
Active Contributor

Join Date: Aug 2010
Location: Quito, Ecuador
Posts: 16
#14

Re: How to Lift a Load with CG Misaligned to Lifting Device

10/08/2010 10:19 AM

Draw a free body diagram and you could find the lenght of each sling, starting with the principle that the moments in both of the sides of your load should have the same value, the weight of your load(divided by 2) times by the distance to the first support eye equals the weight of the load (divided by 2) times by the opposite distance.

Register to Reply
Guru
Safety - Hazmat - New Member Engineering Fields - Retired Engineers / Mentors - New Member Engineering Fields - Piping Design Engineering - New Member Hobbies - DIY Welding - New Member Fans of Old Computers - PDP 11 - New Member

Join Date: Feb 2007
Location: Stronger Than The Storm
Posts: 2394
Good Answers: 203
#15

Re: How to Lift a Load with CG Misaligned to Lifting Device

10/08/2010 4:26 PM

Simpliest way, if the hoist has a single lifting point (such as a hook or shackle), is to use two slings (or chains) of equal length hung from the hoist lifting point to each lifting eye on the load where the slings go directly from the hoist hook to the load lifting eye.

If more than 2 lifting eyes are on the load, then seperate slings should be attached from the hoist hook to each load lifting eye. As long as the slings are of equal length and the hoist hook is located above a polygon formed by the a line from each lifting eye to the next one, the load will lift level.

Good Luck, Old Salt

__________________
Any day on the green side of the grass is a GREAT DAY!, --- me +++++++++. I believe creativity is an inherent part of everyone. --- Kermit T. Frog
Register to Reply
Register to Reply 15 comments

Good Answers:

These comments received enough positive votes to make them "good answers".
Copy to Clipboard

Users who posted comments:

Anonymous Poster (1); carbonmike (1); ChrisEng (1); Doorman (1); ferdy (1); hairlesssimian (1); hernaju1 (1); Lancoz (1); mike k (1); old salt (1); passingtongreen (1); ronseto (1); sawadhkm (1); suresh sharma (1); URAD_Harvey (1)

Previous in Forum: Storage Tanks   Next in Forum: Petal Development

Advertisement