Previous in Forum: Over Voltage Damage The Appliances   Next in Forum: For 11kV Dist Network, Earth Rod Required for Grounding Manholes Rebar and Metal
Close
Close
Close
Rate Comments: Nested
Anonymous Poster #1

Earth rod required for sewage pumps and control panel

10/05/2011 8:40 AM

Please advice us, for grounding sewage pumps, control panel, can we use the embeded copper conductor in duct bank, running parallel to service cable, or separate earth rod required for grounding (near lift station) sewage pumps and control panel.Near lift station due to concrete and asphalt difficult to run the earth rod.

Also advice us the embeded copper conductor 120 sqmm can be used for service grounding from source to starter control panel.

Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru
United Kingdom - Member - Indeterminate Engineering Fields - Control Engineering - New Member

Join Date: Jan 2007
Location: In the bothy, 7 chains down the line from Dodman's Lane level crossing, in the nation formerly known as Great Britain. Kettle's on.
Posts: 32175
Good Answers: 839
#1

Re: Earth rod required for sewage pumps and control panel

10/05/2011 9:25 AM

British Standard 7671.

__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
Reply
Reply to Forum Thread

Previous in Forum: Over Voltage Damage The Appliances   Next in Forum: For 11kV Dist Network, Earth Rod Required for Grounding Manholes Rebar and Metal

Advertisement