Anonymous Poster #1

Take off Materials Vs Bill of Materials

02/01/2013 1:44 PM

Any difference between Take off Materials and Bill of Materials (BOM)?

Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Power-User
United States - Member - NE, USA Hobbies - Target Shooting - New Member Engineering Fields - Aerospace Engineering - Engineering Fields - Electromechanical Engineering - New Member

Join Date: Jul 2007
Location: USA
Posts: 199
Good Answers: 6
#1

Re: Take off Materials Vs Bill of Materials

02/01/2013 2:15 PM

Yes.

The main difference for me is that my company does not use or refer to the MTO.

But wikipedia says: http://en.wikipedia.org/wiki/Material_take_off

Definition used by the ISA (International Society of Automation):
A Material Take Off (MTO) is the process of analyzing the drawings and determining all the materials required to accomplish the design. We then use the material takeoff to create a bill of materials (BOM). Inspection does not aid in creating a bill of materials. Procurement and requisition are activities that occur after the bill of materials is complete.
Reference: Whitt, Successful Instrument and Control System Design, ISA Press, 2004.

Reply Score 1 for Good Answer
Guru
Technical Fields - Technical Writing - New Member Engineering Fields - Piping Design Engineering - New Member

Join Date: May 2009
Location: Richland, WA, USA
Posts: 21017
Good Answers: 795
#2
In reply to #1

Re: Take off Materials Vs Bill of Materials

02/01/2013 4:39 PM

That definition was useless.

__________________
In vino veritas; in cervisia carmen; in aqua E. coli.
Reply
Guru

Join Date: Oct 2008
Posts: 42355
Good Answers: 1694
#3
In reply to #2

Re: Take off Materials Vs Bill of Materials

02/01/2013 4:57 PM

Just as useless as the term?

Does this mean, take the materials off the drawing and create a BOM from them?

I've been involved in mechanical design at some level since 1978 and I've never heard of a whatever it was.

Almost sounds like something to drive your bush hog. No, that's PTO.

Anyway, a good cad program does this automatically.

Reply
Guru
Hobbies - DIY Welding - Don't Know What Made The Old Title Attractive... Popular Science - Weaponology - New Member United States - US - Statue of Liberty - 60 Year Member

Join Date: Apr 2009
Location: Yellowstone Valley, in Big Sky Country
Posts: 7430
Good Answers: 295
#4
In reply to #3

Re: Take off Materials Vs Bill of Materials

02/01/2013 5:08 PM

I'm wondering if our OP is actually looking for Material Take Off, as in a quantity survey done to prepare a price offer.

Take Off Materials sounds like scavenged parts.

__________________
Semper Ubi Sub Ubi
Reply
Guru

Join Date: Dec 2010
Location: North West England
Posts: 1170
Good Answers: 153
#5

Re: Take off Materials Vs Bill of Materials

02/02/2013 5:44 AM

The Take off Materials are what is needed to complete the job, whereas the Bill of Materials includes the additional quantities required to re-do the boss's house, complete the quantity surveyor's house extension, and build a granny flat for the building inspector's mother.

Reply
Guru
Hobbies - Fishing - Old Salt Hobbies - CNC - New Member United States - US - Statue of Liberty - New Member

Join Date: Mar 2007
Location: Rosedale, Maryland USA
Posts: 5197
Good Answers: 266
#6

Re: Take off Materials Vs Bill of Materials

02/02/2013 12:03 PM

Material Take Off will have much more information on it. To calculate cost of the job. It could have the weights of the individual steel beams. This is to know what equipment will be needed to lift it. This type of information is not usually necessary on a bill of material. But is necessary to calculate the cost of equipment in to a bid.

__________________
Life is not a journey to the grave with the intention of arriving in a pretty, pristine body but rather to come sliding in sideways, all used up and exclaiming, "Wow, what a ride!"
Reply Score 1 for Good Answer
Guru
Technical Fields - Technical Writing - New Member Engineering Fields - Marine Engineering - New Member

Join Date: Sep 2008
Location: Vancleave, Ms about 30 miles inland from Biloxi and the coast
Posts: 3197
Good Answers: 106
#7

Re: Take off Materials Vs Bill of Materials

02/03/2013 11:11 AM

In my field of shipbuilding, a material takeoff was a "ballpark" figure used for estimating purposes. It would represent an accuracy of 20% of actual material needed. The BOM is used by the engineering department to define the actual amount of material used.

__________________
Mr.Ron from South Ms.
Reply
Guru
Technical Fields - Technical Writing - New Member Engineering Fields - Piping Design Engineering - New Member

Join Date: May 2009
Location: Richland, WA, USA
Posts: 21017
Good Answers: 795
#8

Re: Take off Materials Vs Bill of Materials

02/03/2013 11:57 AM

In my experience, a BOM accounts for the individual pieces of material used in an assembly (e.g., 12 pcs. 2" Sch 40 pipe x 40"). A material take-off (MTO) consolidates all similar pieces (e.g. 40ft of 2" S40 pipe). Terms may vary by local custom, so there probably isn't one standard answer.

__________________
In vino veritas; in cervisia carmen; in aqua E. coli.
Reply
Guru

Join Date: Aug 2009
Location: Glen Mills, PA.
Posts: 2385
Good Answers: 114
#9

Re: Take off Materials Vs Bill of Materials

02/03/2013 6:30 PM

In my world, an MTO is a list of the major parts, say steel beams in various cost groups, or different diameters of rebar. A BOM is a list of everything, individual beam lengths etc. down to the nuts and bolts and washers.

__________________
In a time of universal deceit, telling the truth is a revolutionary act. George Orwell
Reply
Reply to Forum Thread 9 comments

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Copy to Clipboard

Users who posted comments: