Start Up and Shut Down Tank Piping

03/15/2013 5:14 AM

IN POWER plant start up and shut down tank near HRSG, Where we dump all hot drains.

MY question is that , Our drain line( normally 2 in dia ) parameters are high ( 574 deg C and 148 bar) ,

and our Blow down Tanks lance ( 8 to 12 in dia )design parameters are 574 deg and 5.2 bar.

So what should be the type of connection in between drain line and Tank Lance means, it should be as per branch or as per lance design parameter. We have a control valve on every drain line before lance connection.

I would appreciate any one can help us regarding the behavior of fluid ( Hot drain ) from opening of valve to flushing in lance header. How much pressure and temperature drops in pipe segment in between valve and header.

What govern this phenomenon how we can improve the design of this portion.

Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.

Good Answers:

These comments received enough positive votes to make them "good answers".

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
2
Guru
United Kingdom - Member - Indeterminate Engineering Fields - Control Engineering - New Member

Join Date: Jan 2007
Location: In the bothy, 7 chains down the line from Dodman's Lane level crossing, in the nation formerly known as Great Britain. Kettle's on.
Posts: 32175
Good Answers: 839
#1

Re: start up and shut down tank piping

03/15/2013 5:49 AM

Well, the correct forum for this question is a HazOp Study at the facility where the consequences of the proposed change should be considered with all drawings and relevant personnel present.

It would be unwise to rely on the responses to a posting in an anonymous Engineering internet forum. No-one except the Original Poster can see the plant!

__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
Register to Reply Good Answer (Score 2)
Guru
Engineering Fields - Mechanical Engineering - New Member

Join Date: May 2008
Location: CHENNAI, TAMIL NADU, INDIA.
Posts: 1851
Good Answers: 65
#2

Re: Start Up and Shut Down Tank Piping

03/16/2013 12:02 AM

Dear Mr. chauhan,

Can you pl. provide a sketch.?

What we did is we provided one HEAT EXCHANGER for recovering the Heat from the drain lines as well as Blow down water, with some pre-cautions.

It helped in 2 ways, the Heat was recovered by the Condensate coming out of the Condenser, and all the water recycled. The Temp.of the condensate from the drains were 95 Deg.C only, and the condensate from Condenser was heated considerably, thereby Load on De-Aerator is reduced.

DHAYANANDHAN.S

Register to Reply Score 1 for Good Answer
Register to Reply 2 comments

Good Answers:

These comments received enough positive votes to make them "good answers".

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!

Previous in Forum: LG Washing Machines   Next in Forum: Any Demerits In Cut In and Cut Off of 2 Compressors Together?

Advertisement