The scenery a fertilizer plant builded on 1969
A fertilizer plant integrated by an ammonia plant, Nitric Acid plant, Ammonium Nitrate plant, Urea plant and associated services like boiler, sea water cooling etc.
The thing was that at the moment to start the 250 HP 6 Kv motors( five in total) in succession all of them burned out at the moment to press the start push button.
The motors from manufacturer (x for ethic) supposed were running for 4 hours as part of manufacture test as well as all other work practice and reported ok in their test certificate. the on-site test like winding insulation, polarization index and absorption coefficient read ok.
Then what was wrong in this issue ? ?
It is not a test for your but really result interesting to know. I can forward that the problem was technical and commercial trick that could happen to anyone
Bye