Instrumentation Control Room Requirement

06/29/2013 4:33 AM

Dear All,

we have to prepare Instrumentation Control Room Requirement for the control room on which we shall be keeping PLC Panel along with SCADA Workstation.

what shall be the basic criteria to be followed for Control Room Requirement

Sachin

Register to Reply
Pathfinder Tags: Instrumentation Control Room
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru
Engineering Fields - Electrical Engineering - Been there, done that. Engineering Fields - Control Engineering - New Member

Join Date: Dec 2008
Location: Long Island NY
Posts: 15602
Good Answers: 982
#1

Re: Instrumentation Control Room Requirement

06/29/2013 7:45 AM

Hire intelligent control room operators to work in this control room for this mysterious operation. Ask the operators what information they need to know to safely operate this machine. Provide this information on your PLC panel.

Don't forget to ask the operators how they want the information organised. They may not care about the temperature of the framitz when doing a dingle berry operation. So displaying the framitz temperature with dingle berry concentration may not be helpful now. However when they're finished dispensing dingle berries, the temperature and pressure level of the framitz maybe just what they need to know during cleaning operation.

__________________
"Don't disturb my circles." translation of Archimedes last words
Register to Reply
Associate

Join Date: Apr 2012
Location: Lollipop Land
Posts: 34
Good Answers: 2
#2

Re: Instrumentation Control Room Requirement

06/29/2013 9:54 AM

ISA published standards on various aspects of control room design some years ago. The standard numbers are part of the file names:

Being standards, they include such profound good practices as, "Removable handles and key-operated switches may he (sic) used to prevent unauthorized operation." (Evidence that even standards organizations do not proof read their own material)

__________________
Toto, I've a feeling we're not in Kansas anymore
Register to Reply
Guru

Join Date: Oct 2008
Posts: 42355
Good Answers: 1693
#3

Re: Instrumentation Control Room Requirement

06/29/2013 10:15 AM

"we have to prepare"

How many people are on this team, and why don't any of them have a clue what to do?

I'd suggest some intensive study of business ethics followed by training in instrumentation, since you seem to know nothing about either.

I don't think ethical people would take money to performing try to do something that you do not know how to do.

Worse yet, you come to an anonymous web site and ask those here to do your work for you.

Shame, shame.

From a former thread: You've not made any progress: Dear all,

This is Sachin Mishra from India

Currently i am working as Design Manager in on of the company

I want to know what are the basics of Instrumentation Designing

like wise we are using different type of Flow,Level,Temp Instruments in various projects

Kindly help me in designing of Control Valve Designing,Cv Calculation

What are basic difference in sizing of On off & Control Valve

How to do selection of Flow,Level Transmitters

i am waiting for Reply

Register to Reply
Guru

Join Date: Jun 2011
Location: Mossel Bay, SA
Posts: 777
Good Answers: 21
#5
In reply to #3

Re: Instrumentation Control Room Requirement

07/01/2013 3:36 AM

The scope of your questions is frightening, and the fact that you believe you may get detailed answers/ instructions even more so....

You don't need to ask an engineer, you need to hire one !

Register to Reply
Guru

Join Date: Oct 2008
Posts: 42355
Good Answers: 1693
#4

Re: Instrumentation Control Room Requirement

06/29/2013 10:46 AM

I have gone back and reviewed EVERY ONE OF YOUR POSTS.

Without exception you demonstrate a complete lack of knowledge of any of the "projects" you have worked on.

ALL of your posts indicate that someone is paying you to perform a task, about which you know NOTHING!!!! Then you come here and ask us to do the work for you.

You are a disgrace to the engineering profession, the instrumentation profession, solvent extraction profession, the HVAC profession, the oven automation profession, the data streaming profession, the process engineering profession, and many more that I missed.

It appears to me that you should be shoveling dung somewhere and not taking people's money under false pretenses.

There's a saying here in the USA, "you don't know jack". Fella, you don't know jack!

I'll OT this to save you the trouble.

Register to Reply Off Topic (Score 5)
Guru
United Kingdom - Member - Indeterminate Engineering Fields - Control Engineering - New Member

Join Date: Jan 2007
Location: In the bothy, 7 chains down the line from Dodman's Lane level crossing, in the nation formerly known as Great Britain. Kettle's on.
Posts: 32175
Good Answers: 839
#6

Re: Instrumentation Control Room Requirement

07/01/2013 3:39 AM

Whatever it says in the User Requirement Specification document for the project.

__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
Register to Reply
Power-User

Join Date: Dec 2010
Location: Tulsa, OK
Posts: 184
Good Answers: 2
#7

Re: Instrumentation Control Room Requirement

07/01/2013 10:31 AM

SachinMishra:

The company I work for designs among other things control rooms if you are interested pm and we can discuss what kind of a control room you need.

Regards

AVarga

Register to Reply
Associate

Join Date: Dec 2007
Location: Dubai
Posts: 32
Good Answers: 1
#8

Re: Instrumentation Control Room Requirement

07/03/2013 5:56 AM

If you have basic knowledge in PLC/SCADA - one of my coworkers had manage to complete both Scada/PLC program thru online programming at one of our Africa and Asia project at both TIC and District Cooling Plant.

Should you feel interested in this particular skills, please feel free to contact me - Nelson/Dubai, nlparedes2006@yahoo.com

__________________
nlp
Register to Reply
Register to Reply 8 comments
Copy to Clipboard

Users who posted comments:

Hilton (1); lyn (2); MagicWand (1); nelson1 (1); PWSlack (1); redfred (1); vargaalex (1)